Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 38
Outdoor Living Today
Flower Box Assembly Instructions
2.
Position Front Frame Piece flush with End Cap. Attach both ends with 2 - 1 1/4” screws. Pilot hole
Rear Box Frame near bottom center and secure to Base edge with 1 - 1 1/4” screw. Evenly position
Front Trim (mitre cut on end and dado cut on inside bottom) tight against front frame and nail down
with 4 - 1 1/4” nails. Position Side Trims as per Front and secure with 3 - 1 1/4” nails per side.
1.
On a table position Rear Box and End Cap Frames together so flush at top. Fasten together with
2 - 1 1/4” screws. Place Base Frame tight against Rear and End Cap and flush at bottom. Secure
with 2 - 1 1/4” screws. Complete attachment of remaining End Cap Frame. Slide Front Frame
between End Caps.
3.
On a flat surface, flip Flower Box on it’s rear face. Evenly space Brackets and secure through
Base Frame and into the Brackets with 2 - 1 1/4” screws per Bracket. Position completed Flower
Box beneath window trim and screw from inside of box into the center wall stud with 2 - 2” screws.
(2” screws supplied with Base Kit.)
Parts Lists:
A - Base, Rear & Front Box Frames (3pcs)
3/4” x 5 1/2” x 23”
B - End Cap Frames
(2pcs)
3/4” x 5 1/2” x 7” / 8”
C - Front Trim
(1 pc)
3/4” x 1 1/2” x 26”
D - Side Trims
(2 pc)
3/4” x 1 1/2” x 8 3/4”
E - Brackets
(2 pc)
1 1/2” x 5 1/2” x 5 1/2”
F - 1 1/4” Screws
G - 1 1/4” Nails
Rear (A)
Front (A)
Base (A)
End Caps (B)
Front Trim (C)
Side Trims (D)
Brackets (E)
1 1/4”
Screws (F)
1 1/4”
Nails (G)
Re
ar
(A)
Right Angle Cut to Rear
Flush
Base
(A)
Fron
t (A)
End Cap
Fro
nt
Flush
Front Trim
Side Trim
Rear
1 1/4” screws
Flush
2” screws
Exploded
View
1 1/4” Screw
Rear (A
)
1 1/4”
Nails