background image

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

**Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

01DTPRMSHAX1010DDOP-V1

DIP TREATED PREMIUM SHIPLAP APEX 10X10 DOUBLE DOOR OPENING WINDOW

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy 

or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treat-

ment to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base 

dimensions,  The base should be slightly smaller than the external measurement of the building, i.e. The cladding 

should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above 

the surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

P 1

Please retain product label and instructions for future reference

             

General Instructions

Summary of Contents for 01DTPRMSHAX1010DDOP-V1

Page 1: ... avoid placing your garden building underneath large trees to prevent the tree causing damage to the building TIMBER As with all natural materials timber can be affected during various weather conditions For the duration of heavy or extended periods of rain swelling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortun...

Page 2: ...MSHAX0210NWPB V1 QTY 2 Base Dimensions Width 3064mm Depth 4168mm 15X10 Apex Overall Dimensions Width 3229mm Depth 4572mm Height 2504mm Pack Requirement 01DTPRMSHAX1010DDOP V1 QTY 1 01DTPRMSHAX0510OPPB V1 QTY 1 Base Dimensions Width 3064mm Depth 4466mm 16X10 Apex Overall Dimensions Width 3229mm Depth 4870mm Height 2504mm Pack Requirement 01DTPRMSHAX1010DDOP V1 QTY 1 01DTPRMSHAX0210NWPB V1 QTY 3 Bas...

Page 3: ...epth 4274mm Height 2504mm Pack Requirement 01DTPRMSHAX1010DDOP V1 QTY 1 01DTPRMSHAX0210NWPB V1 QTY 2 Base Dimensions Width 3064mm Depth 4168mm 15X10 Reverse Apex Overall Dimensions Width 3229mm Depth 4572mm Height 2504mm Pack Requirement 01DTPRMSHAX1010DDOP V1 QTY 1 01DTPRMSHAX0510OPPB V1 QTY 1 Base Dimensions Width 3064mm Depth 4466mm 16X10 Reverse Apex Overall Dimensions Width 3229mm Depth 4870m...

Page 4: ...TY 2 Truss Brace 27x44x1700mm QTY 2 F2744 G 1740mm Truss Support Triangle 12x503mm QTY 2 MB12 P 503mm Door Cloaking Strip 27x44x1658mm QTY 1 F2744 1658mm Door Beading Strip 12x30x1600mm QTY 2 S1230 1600mm Window Strip 12x56x1038mm QTY 2 S1256 1038mm Cover Strip 12x56x2500mm QTY 4 S1256 2500mm Cover Strip 12x56x1774mm QTY 6 S1256 1774mm Fascias 12x60x1766mm QTY 4 S1260 G 1766mm 27 U Channel QTY 2 P...

Page 5: ...56x1774mm QTY 2 S1256 1774mm Window Strip 12x56x1038mm QTY 1 S1256 1038mm 13 27 U Channel QTY 2 PI 07 0013 Casement stay QTY 1 PI 07 0007 Butt Hinge QTY 2 PI 07 0066 30 26 5ft Floor Panel AI S21MBF1529X1485 V2 QTY 2 2 Plain Panel AI S21SHPPTF1490X1784 V1 QTY 1 5ft Roof Panel AI S21MBOHAR1490X1760 QTY 2 38 6 Door AI S21FBMBZBD600X1720 V1 QTY 2 Truss Brace 27x44x1700mm QTY 2 F2744 G 1740mm Truss Blo...

Page 6: ...mm screws per join Ensure to go through the floor cladding and into the framing Repeat the Step to create a second floor 40mm screw Pre drill hole 16x10 20x10 12x10 36 5 5 5 5 5 5 36 5 5 36 36 5 5 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Step 2 Building Size Parts needed QTY 12 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 48 QTY 14 QTY 56 QTY 16 QTY 64 QTY 18 QTY 72 QTY...

Page 7: ... there is equal spacing between the floor and cladding on all sides Step 4 2 50mm screw Pre drill hole Building Size Please note Panels No 1 No 2 No 3 No 4 No 35 No 39 are interchangeable and can be positioned in a variety of configurations Decide which works best before assembly NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Locate the Panels No 1 No 2 No 35 No 39 onto the fl...

Page 8: ...nto the gable framing Repeat Step to create two assembled gables a b c a b c 23 9 18 Locate the Assembled Gable tops No 8 and No 9 onto the tops of the front and back panels Fix the gable tops to the panels bellow using 8x50mm screws per Gable top in an alternating pattern as shown in the diagram Do not secure the building to the floor until the roof is fitted 50mm screw Pre drill hole Step 8 Part...

Page 9: ...Y 20 QTY 6 QTY 2 QTY 4 QTY 6 QTY 4 QTY 8 QTY 10 100mm Screw 20X10 16X10 12X10 22 22 11 11 22 22 22 11 11 22 22 11 11 22 22 11 11 22 22 22 11 11 11 11 11 11 11 11 22 22 22 22 22 11 11 22 22 11 11 22 Building Size Parts needed QTY 2 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 10 QTY 2 QTY 20 QTY 2 QTY 30 QTY 2 QTY 20 QTY 2 QTY 40 QTY 2 QTY 50 QTY 2 QTY 30 No 7 No 27 30mm Screw QTY 1 QTY 2 QTY 3 QT...

Page 10: ...les and truss Do not fix the roof panels until all roof panels are in place Ensure there is an equal amount of roof overhang on either side of the building Secure the roof panels No 7 No 37 No 38 together using the metal U channel No 32 and 10x30mm screws per U channel 7 37 7 37 37 7 7 37 7 7 20X10 16X10 12X10 38 38 Building Size Ensure there is an equal amount of roof overhang on either side of t...

Page 11: ...w 30 Place the Window Strip No 13 11mm above the window gap in the window panel and fix with 3x30mm screws per strip If you would like the windows to be opening use the Butt Hinges No 30 to attach to the window strip and the Window No 10 together Use 30mm screws to fix the butt hinge to the Window Strip and 16mm screws to fix it to the Window If you want to fix the windows instead of fixing butt h...

Page 12: ...QTY 12 QTY 18 QTY 12 QTY 12 QTY 18 Building Size 16mm screw Pre drill hole P 12 Step 17 Parts needed QTY 2 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 3 No 6 No 28 QTY 6 QTY 6 QTY 6 QTY 6 QTY 6 QTY 6 QTY 9 QTY 63 30mm Screw QTY 42 QTY 42 QTY 42 QTY 42 QTY 42 QTY 42 Fix the T Hinges No 28 onto the doors No 6 as shown using 7x30mm screws per T hinge Ensure that the sc...

Page 13: ... into the Door Cloaking Strip Locate the Door beading strips No 12 between the door panel framing and the door framing ensuring it is equally spaced secure using 4x30mm screws per strip ensuring to go through to the door panel framing 20 20 21 ALL BUILDINGS Building Size Step 19 16mm screw Pre drill hole 29 29 Align the tower bolts No 29 onto the door cloaking strip secure the bolts to the top and...

Page 14: ...4 30mm screw Pre drill hole Step 22 Parts needed QTY 2 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 4 No 34 30mm Screws QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 4 Building Size Attach the turn buttons No 34 to the secondary door at the top and bottom using 1x30mm screw per turn button 20x10 Attach the turn buttons No 34 to the door at the top and bottom using 1x30mm s...

Page 15: ...QTY 220 QTY 225 QTY 255 QTY 290 QTY 300 Building Size 10X10 33 3150mm Cut four strips of felt No 33 and place onto the roof Place the felt flat onto the roof in the order that is stated on the diagram below Once the sheets are laid out fix them onto the roof with tacks 100mm apart Felt tacks HANDLE WITH CARE 1 2 3 4 1 2 3 4 P 15 12X10 14X10 15X10 16X10 18X10 20X10 33 33 33 33 33 33 3750mm 4350mm 4...

Page 16: ...QTY 52 Building Size Step 24 15 15 15 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 15 15 15 15 15 15 15 15 15 15 15 14 14 14 14 14 14 15 15 14 P 16 30mm screw Pre drill hole 16 16 25 16 16 Fix the Fascias No 16 to each side of the building ensuring they are flush to the top of the building secure using 3x30mm screws per fascia Fix the Shed Diamond No 25 to ea...

Page 17: ...m screws per join Ensure to go through the floor cladding and into the framing Repeat the Step to create a second floor 40mm screw Pre drill hole 16x10 20x10 12x10 36 5 5 5 5 5 5 36 5 5 36 36 5 5 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUSTRATIONS ARE EXAMPLES Step 2 Building Size Parts needed QTY 12 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 48 QTY 14 QTY 56 QTY 16 QTY 64 QTY 18 QTY 72 QTY ...

Page 18: ... is equal spacing between the floor and cladding on all sides 50mm screw Pre drill hole Please note Panels No 1 No 2 No 3 No 4 No 35 No 39 are interchangeable and can be positioned in a variety of configurations Decide which works best before assembly a a a a 4 1 a Parts needed QTY 1 All Sizes QTY 8 QTY 1 No 1 No 4 50mm Screw Building Size Step 4 P 18 NOT ALL SIZE OPTIONS ARE SHOWN BELOW THE ILLUS...

Page 19: ...framing Repeat Step to create a second assembled gable top a b c a b c 23 9 18 Locate the Assembled Gable tops No 8 and No 9 onto the tops of the front and back panels Fix the gable tops to the panels bellow using 8x50mm screws per Gable top in an alternating pattern as shown in the diagram Do not secure the building to the floor until the roof is fitted 50mm screw Pre drill hole Step 8 Parts need...

Page 20: ...QTY 16 QTY 20 QTY 6 QTY 2 QTY 4 QTY 6 QTY 4 QTY 8 QTY 10 100mm Screw 20X10 16X10 12X10 22 22 11 Building Size 11 11 22 22 11 22 22 11 22 22 11 22 22 11 22 22 11 22 22 11 22 22 11 22 22 11 22 22 P 20 Parts needed QTY 2 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 10 QTY 2 QTY 20 QTY 2 QTY 30 QTY 2 QTY 20 QTY 2 QTY 40 QTY 2 QTY 50 QTY 2 QTY 30 No 7 No 27 30mm Screw QTY 1 QTY 2 QTY 3 QTY 2 QTY 4 QTY...

Page 21: ...les and truss Do not fix the roof panels until all roof panels are in place Ensure there is an equal amount of roof overhang on either side of the building Secure the roof panels No 7 No 37 No 38 together using the metal U channel No 32 and 10x30mm screws per U channel 7 37 7 37 37 7 7 37 7 7 20X10 16X10 12X10 38 38 Building Size P 21 Ensure there is an equal amount of roof overhang on either side...

Page 22: ...w 30 Place the Window Strip No 13 11mm above the window gap in the window panel and fix with 3x30mm screws per strip If you would like the windows to be opening use the Butt Hinges No 30 to attach to the window strip and the Window No 10 together Use 30mm screws to fix the butt hinge to the Window Strip and 16mm screws to fix it to the Window If you want to fix the windows instead of fixing butt h...

Page 23: ...Y 12 QTY 18 QTY 12 QTY 12 QTY 18 Building Size 20mm screw Pre drill hole P 23 Step 17 Parts needed QTY 2 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 3 No 6 No 28 QTY 6 QTY 6 QTY 6 QTY 6 QTY 6 QTY 6 QTY 9 QTY 63 30mm Screw QTY 42 QTY 42 QTY 42 QTY 42 QTY 42 QTY 42 Fix the T Hinges No 28 onto the doors No 9 as shown using 7x30mm screws per T hinge Ensure that the scre...

Page 24: ...r cladding and into the Door Cloaking Strip Locate the Door beading strips No 12 between the door panel framing and the door framing ensuring it is equally spaced secure using 4x30mm screws per strip ensuring to go through to the door panel framing 20 20 21 ALL BUILDINGS Building Size Step 19 20mm screw Pre drill hole 29 29 Align the tower bolts No 29 onto the door cloaking strip secure the bolts ...

Page 25: ... 40 20X10 P25 Step 22 Parts needed QTY 2 10x10 12x10 14x10 15x10 16x10 18x10 20x10 QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 4 No 34 20mm Screws QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 2 QTY 4 Building Size Attach the turn buttons No 34 to the secondary door at the top and bottom using 1x30mm screw per turn button 20x10 Attach the turn buttons No 34 to the door at the top and bottom using 1x30mm screw per turn ...

Page 26: ...QTY 220 QTY 225 QTY 255 QTY 290 QTY 300 Building Size 10X10 33 3150mm Cut four strips of felt No 33 and place onto the roof Place the felt flat onto the roof in the order that is stated on the diagram below Once the sheets are laid out fix them onto the roof with tacks 100mm apart Felt tacks HANDLE WITH CARE 1 2 3 4 1 2 3 4 12X10 14X10 15X10 33 33 33 3750mm 4350mm 4610mm P 26 16X10 18X10 20X10 33 ...

Page 27: ...TY 14 QTY 10 No 14 No 15 QTY 4 QTY 4 QTY 4 QTY 4 QTY 4 QTY 4 QTY 4 QTY 40 30mm Screw QTY 30 QTY 36 QTY 40 QTY 36 QTY 46 QTY 52 Building Size Step 24 10X10 15 15 15 14 14 14 14 14 14 15 P 27 Fix the Fascias No 16 to each side of the building ensuring they are flush to the top of the building secure using 3x30mm screws per fasica Fix the Shed Diamond No 25 to each side of the building secure using 2...

Page 28: ... 2 1 3 4 ...

Page 29: ... 1 2 ...

Reviews: