background image

Outdoor Living Today                www.outdoorlivingtoday.com             [email protected]

Page 6

Regular Maintenance & Tips to prolong the life of your shed.

Before/During Assembly:

 

 1.) Paint each face and edge of your plywood floor with a latex exterior paint. 
 2.) Caulk wall seams if gaps appear. 
 3.) Caulk around window framing. 
 4.) Caulk perimeter between floor plywood and bottom wall plate. 
 5.) Caulk channels in lap siding at the top of your door above the trim, just a drop in each chan-
nel. 
 6.) Caulk edge of door threshold. 
 7.) Optional: Install a Sill Gasket between floor runners and foundation. 
 8.) Optional: Install an 8” strip of roofing paper below Cedar Ridge Caps for Cedar Roof Sheds.

Routine Maintenance:

 

 - Routinely check all fasteners are tight (ex. Door Hinges, Nails) 
 - Brush off dirt from walls. 
 - Brush off snow from roof regularily. 
 - Routinely remove needles and leaves from Metal Roof.

Painting/Staining

 

 - Your cedar shed, if left untreated, will weather to a silvery grey colour. 
 - Painting or staining your structure is highly recommended and will prolong the life of your shed. 
 - You do not need to wait to paint or stain your shed, the wood in your kit has been dried and can 

 

   be stained or painted immediately. 
 - Consult your local paint store for the best paint or stain for cedar. 
 - Optional: stain the inside of your shed. (Note: this will remove the fresh cedar smell.)

1.

2.

3.

4.

5.

6.

7.

Sill Gasket

Floor Joists

Foundation

8.

Floor Plywood

Wall Panel

Dab of caulking

Strip of roofing paper over 
apex of roof panels

Floor Runner

Small gap  
between bevel 
siding and  
window trim

Summary of Contents for CABANA CB128-SLIDER-CEDAR-BEV

Page 1: ...fects in manufacturing and workmanship Costs incurred for customer installations are not included Failure to use supplied parts included in this kit could result in poor product performance and may vo...

Page 2: ...nsure there are no gas or electric lines buried in the area before digging Decide on the type of foundation you will be using Concrete slab or 4 6 inches of crushed gravel with paver stones or 4x4 str...

Page 3: ...ws 7 4x4 Pressure Treated Stringers 8 long required Evenly spaced with one at each end of floor frame Saves money on materials easy to level and work with Gravel with Patio Paver Stones Excavate at le...

Page 4: ...of Rafters 1 1 2 x 3 1 2 x 56 1 2 4 Soffits 1 x 4 1 2 x 68 1 4 3 Roof Gussets angle cut on ends 3 4 x 3 1 2 x 72 Roof 4 Outer Roof Panels 51 x 59 1 4 2 Middle Roof Panels 45 1 2 x 59 1 4 16 Filler Shi...

Page 5: ...ly x 4 90 Metal Bracket x 8 Tools Required Not Provided Safety Equipment Required Not Provided 12x8 CABANA CEDAR ROOF Safety Glasses Work Gloves Ladder Screw Gun Drill Tape Measure Hammer Wood Clamp L...

Page 6: ...tine Maintenance Routinely check all fasteners are tight ex Door Hinges Nails Brush off dirt from walls Brush off snow from roof regularily Routinely remove needles and leaves from Metal Roof Painting...

Page 7: ...Joist so flush with framing Parts Steps 1 6 Floor Joists 1 1 2 x 3 1 2 x 71 7 8 x 6 Floor Joist Frames Large 45 1 2 x 75 x 3 Floor Joist Frames Small 45 1 2 x 21 x 3 Hardware Steps 1 6 2 1 2 Screws x...

Page 8: ...er and 3 smaller Frame Sections The Footprint for the floor when attached together will be 136 1 2 wide x 96 deep 5 Complete all large and small frame attachments Screw each completed section together...

Page 9: ...our foundation Caution you will need 2 people to assist you Be careful when laying floor down not to bend or twist floor When in place level floor completely Note The floor will be flipped over and th...

Page 10: ...Small 45 3 8 x 20 7 8 x 3 Hardware Steps 10 11 1 1 4 Screws x 70 total approx Important Make sure floor is level before moving on to wall section Use a level to confirm and shim floor joists as requi...

Page 11: ...ch easier to attach together Pilot Hole first Bottom Wall Plate 12 For each Solid Wall Panel Front Wall Panel carefully lay panel face down Position and attach Bottom Wall Plates to bottom of wall stu...

Page 12: ...ing will overhang the Floor by approximately 1 2 Front of Shed Important Make sure all walls are aligned in their upright position If not water may leak into your shed 1st Rear Wall Panel side of shed...

Page 13: ...with 3 2 1 2 Screws Screw at the bottom middle and top of stud to secure properly Hardware Steps 15 17 2 1 2 Screws x 18 total Rear Wall S i d e W a l l 16 With the corner wall attachment complete pos...

Page 14: ...oorlivingtoday com sales outdoorlivingtoday com Page 14 17 Complete all Side and Rear Wall attachments as per Steps 15 16 The rear wall is made up of three Rear Solid Wall Panels Pilot Hole first Pilo...

Page 15: ...3 x 2 Hardware 2 1 2 Screws x 6 total 19 Position Door Header Short on top of wall stud so it is flush on the inside with 2x3 wall stud Attach by screwing down into top wall framing with 3 3 Screws Pa...

Page 16: ...t Attach by screwing down into wall framing with 2 3 Screws per side Fasten aluminum strip to Short Headers with 2 1 1 4 Screws per side Aluminum strip on back of Long Door Header 21 Attach Interior D...

Page 17: ...to right Attach by screwing down into top wall framing with 3 2 Screws per Plate Parts Steps 23 24 Side Wall Top Plates 4 Angle Cut End 2 Straight Cut 3 4 x 2 1 2 x 32 x 6 Front Rear Wall Top Plates A...

Page 18: ...ll fit between Side Top Plates Attach with 4 2 Screws per plate Complete all other Side Rear Top Plate attachments the same Male Female Gable Siding Overlap 25 Locate Triangular Gable Half Walls for b...

Page 19: ...s and Top Wall Plate with 2 2 Screws Gables may need slight adjustment in Step 35 when attachment will be completed with an additional 6 Screws Screw from the bottom of Gable framing down into Top Wal...

Page 20: ...with Metal Ridge Board Connector using 8 3 4 silver screws Position Metal Ridge Board Connector evenly on Ridge Boards Total length when connected is 136 1 2 Complete two sets Roof Gussets 3 Roof Raft...

Page 21: ...will be flipped over in Step 30 30 Attach end of a Soffit Board flush to ends of outside Rafters with 2 2 1 2 Screws per rafter end Drill pilot hole in Soffit ends to prevent splitting Complete both...

Page 22: ...up on gable framing until bottom of Ridge Board slips into gable notch Soffit will sit approximately 1 8 away from wall panel Soffit Gable Notch Ridge Board Rafter Soffit should sit approx 1 8 away fr...

Page 23: ...lls closer together from outside Walls should be 91 apart at top from inside of wall plate to wall plate Hardware 1 1 4 Screws x 12 total 3 4 Screws x 8 total Offset Metal Ridge Board Connectors Impor...

Page 24: ...f shed Attach with 2 1 1 4 Screws and 2 2 Screws per Single Bracket and 6 2 Screws per Double Bracket 2 Screws 2 Screw 2 Screw 1 1 4 Screw 2 Screws 1 1 4 Screw Hardware 1 1 4 Screws x 12 total 2 Screw...

Page 25: ...outside screw down through bottom row of Shingles into Rafter with 1 2 1 2 Screw Angle 1 2 1 2 Screw from outside Rafter into Roof Plywood 40 Locate a Middle Roof Panel Roof Plywood flush with outsid...

Page 26: ...ls as per Steps 39 41 Outside Panel 43 Roof Filler Shingles are included to cover Roof seams Starting at the bottom slide the first Long Shingle in until flush with other bottom Shingles Parts Steps 4...

Page 27: ...angle Using 3 2 1 2 Screws secure Rafters to Roof Plywood Note from outside have a helper push Roof Panel down so Plywood sits flush against Rafter when securing Hardware 2 1 2 Screws x 18 total 45 S...

Page 28: ...iew of all parts necessary to complete the Skirting Trim Fascia and Miscellaneous Pieces Identify all parts prior to starting Roof Ridge Caps 22 Pentagon Facia Plates 2 Horizontal Gable Plates 2 Facia...

Page 29: ...irting pieces should end at the notch in the Floor Runner Complete Side and Rear Skirting the same way note that the Side and Rear Skirting pieces are bevelled Parts Bottom Skirting Side Rear Bevel 1...

Page 30: ...ils to secure each piece Parts Horizontal Gable Trims Bevel 1 2 x 4 1 2 x 45 1 4 x 4 Hardware 1 1 2 Finishing Nails x 16 total 50 Attach Filler Trim to each corner side wall Align Filler Trim so it si...

Page 31: ...k and Door Header Extra piece of lap siding can be used as a spacer 3 8 Door Header Front Soffit A wood clamp may be helpful to hold the track in place while attaching to Soffit Lap Siding Note Alumin...

Page 32: ...lide Rollers into the Aluminum Door Track Repeat with Right Side Door and slide until doors meet in the middle Left Side Door Parts Sliding Doors 36 x 73 x 2 Right Side Door Twist Roller Cart onto bol...

Page 33: ...e of bottom skirting Door Tracks rest on Long Floor Runners Bottom of Door Stops and Door Tracks should be flush with each other Secure Door Tracks to shed with 6 3 screws per piece Secure Door Stops...

Page 34: ...ack Covers Lineup so Track Covers are flush with Door Stops This creates an enclosure so doors can not slide out of the track Secure each piece of Track Cover with 4 2 1 2 Screws Parts Lower Door Trac...

Page 35: ...t side door when viewed from the front of the shed Ensure Flange is flush with the inside of the door frame and attach with 5 1 1 4 Screws Parts Interior Door Flange 3 4 x 3 1 2 x 71 1 2 x 1 Hardware...

Page 36: ...orner Trim align tight underneath Soffit and Rafter Align Wide Corner Trim with bottom of Corner Trim Corner Trim will cap the Wide Corner Trim Do a dry run in each corner before attaching to confirm...

Page 37: ...inishing Nails per piece to secure Parts Side Wall Narrow Trim 1 2 x 2 1 2 x 77 1 2 x 2 Hardware 1 1 2 Finishing Nails x 16 total 60 Attach Rear Wall Narrow Trim where wall panels come together and le...

Page 38: ...with end of Rafter Gap where Facia boards come together at peak will be covered in Step 65 Front Rear Facia May have gap Will get covered later Parts Facia Nailing Strips 3 4 x 2 1 2 x 51 x 4 Hardware...

Page 39: ...the middle Use 4 1 1 2 Finishing Nails per piece to secure Complete both sides Attach Horizontal Gable Detail Plates to cover seams where Horizontal Gable Trims meet Secure with 4 1 1 2 Finishing Nail...

Page 40: ...amount 67 Place 1st Roof Ridge Cap on roof peak overhanging shingles by approximately 1 Attach with 2 1 1 2 Shingle Nails 9 from end Place 2nd Ridge Cap 1 back from first cap Attach with 2 1 1 2 Shing...

Page 41: ...lange of window will roughly sit in the dado to give a better fit Complete both windows the same Parts Window Trim Kit x 2 Top pc 24 1 16 x 1 Angle Ends Side Bottom pcs 23 x 3 Hardware 1 1 2 Finishing...

Page 42: ...color we suggest that you treat the wood with a good oil base wood stain You may also wish to paint your new shed rather than stain it In both cases we recommend that you consult with a paint and stai...

Reviews: