Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 25
39.
Place
Outside Roof Panel
so it sits flush on 3rd Rafter from the outside (doubled up Rafter).
Plywood on Roof should be flush with end of Rafter at bottom, and with seam of doubled up Rafters.
From the outside, screw down through bottom row of Shingles into Rafter with
1 - 2 1/2” Screw
. Angle
1 - 2 1/2” Screw
from outside Rafter into Roof Plywood.
40.
Locate a
Middle Roof Panel
(Roof Plywood flush with outside of Shingles), and place on middle
Rafters. Align panel as per
Step 39
and screw panel down to Rafters with
2 - 2 1/2” Screws
in the
bottom row of Shingles.
2 1/2” Screw in Bottom
Row of Shingles.
Angle Screw from
Rafter into Plywood
with 2 1/2” Screw.
Roof Plywood recessed
1/8” from Rafter end.