Outdoor Living Today www.outdoorlivingtoday.com [email protected]
Page 12
Side of Shed
14.
Starting at rear corner, position a
Rear Solid Wall Panel
on top of Plywood Floor. The Bottom
Wall Plate will sit flush with Plywood. Wall siding will overhang the Floor. The Rear Wall panels will sit
flush at the end of the Plywood Floor with the Side Wall panels sandwiched between them.
Note:
Siding will overhang the Floor by approximately 1/2”.
Front of Shed
Important -
Make sure all walls are aligned in their upright position. If not, water may leak into your
shed.
1st Rear Wall Panel
side of shed
13.
Lay out all the Wall Panels and become familiar with their location. On Standard Kits, there are
7 Solid Wall Panels and 2
Front Wall Panels.
Make sure to position panels right side up so water is
directed away from and not into shed. Look at door opening and exposed wide Floor Runner to
determine proper wall position to confirm.
1st Rear Solid
Wall Panel
1/2” overhang
Flush with
Floor Framing