Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 18
32.
Locate the 2nd row of battens
(2 Outside Roof Battens 3/4” thick x 3 1/2” wide x 39” long
and 1 Middle Roof Batten 3/4” x 3 1/2” x 35” long)
. Place batten 15.5” up from first row of battens.
Center Batten will sit evenly on center rafter (3/4”from edge). Attach with 1 1/4” screws. Pre-drill first
to prevent end from splitting.
33.
Attach middle and last outside batten with 1 1/4” screws to complete 2nd row of battens.
Make sure to position batten correctly before securing.
34.
Position and attach 3rd row of battens as per
the first row. Third row battens are the same size as
the first row but alternate long with short. Place
batten 15.5” up from second row of battens.
39” Long Batten
15.5”
center batten on center rafter
15.5”
15.5”
Angle screw
35” Long Batten