background image

9x6 Cabana - Bevel 

Assembly Manual 

(Metal Roof)

 

Some of the safety and usage measures you may wish to consider include: 

 
-snow load ratings vary by geographical location. If heavy or wet snowfall occurs, it is advisable to sweep the 
snow off the roof(s).  
-if the product is elevated, any structural and building code requirements are solely the customer's  
responsibility, and should be abided by.  
-in high or gusty wind conditions it is advisable to keep the structure securely grounded.  
-have a regular maintenance plan to ensure screws, doors, windows and parts are tight.  

 
Customer agrees to hold Outdoor Living Today Partnership and any Authorized Dealers free 
of any liability for improper installation, maintenance and repair.

Version #4 

May 26, 2020

1-888-658-1658                        www.outdoorlivingtoday.com            [email protected]

Page 1

In the event of a missing or broken piece, simply call the Outdoor Living Today Customer Support Line  
@ 1-888-658-1658 within 30 days of the delivery of your purchase. It is our commitment to you to courier  
replacement parts, free of charge, within 10 business days of this notification. Replacement parts will not be  
provided free of charge after the 30 day grace period. 

 
Safety Points and Other Considerations 
Our products are built for use based on 
proper installation and normal residential 
use, on level ground. Please follow the  
instruction manual when building your  
shed and retain the manual for future  
maintenance purposes.

Note:  The General Assembly Manual 
illustrates a Door Configuration in the 
front center location. The Door can also 
be positioned in the front corners. To 
correctly configure Door in front  
corners, follow general assembly steps 
and refer to Page 39 for required 
changes.

Thank you for purchasing 
a 9x6 Cabana. Please take 
the time to identify all the 
parts prior to assembly. 

Summary of Contents for 9x6 Cabana Bevel

Page 1: ...om Page 1 In the event of a missing or broken piece simply call the Outdoor Living Today Customer Support Line 1 888 658 1658 within 30 days of the delivery of your purchase It is our commitment to yo...

Page 2: ...ing Bevel Corner Wall Trim 8 7 8 x 2 1 2 x 36 Filler Trims 5 3 4 x 1 1 2 x 34 3 4 Top Wall Trim Bevel 4 3 4 x 4 1 2 x 32 3 4 Horizontal Gable Trims Bevel 4 1 2 x 3 1 2 x 79 Corner Trims 4 1 2 x 5 1 2...

Page 3: ...e Hammer Wood Clamp Level Pliers Tools Required Not Provided Silver Barrel Bolt Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 3 1 8 3 8 Drill Bits N1 1 1 2 Nail...

Page 4: ...adjust height as necessary Having a solid and level foundation is the most critical piece of work you can do to make the project go smoothly Most of this work can be done prior to your shed arriving 4...

Page 5: ...88 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 5 You can find the Square Drive Bit for the screws in with the Hardware Kit Bag Middle of joist to middle of joist 10 3 4 13 3...

Page 6: ...Attach the Floor Joist Frames together with 6 2 1 2 Screws per section When completed your floor joist section should be 105 wide x 75 deep 4 Attach Long Short Floor Runners to completed floor frame T...

Page 7: ...es on top of completed Floor Joists Plywood will sit slightly back from outside edge of Floor Joist Framing When in correct position attach with 1 1 4 Screws Use screws every 16 The Plywood is cut sli...

Page 8: ...de Top Wall Plate 2 Angle cut on end Bottom Wall Plates 7 Toll Free 1 888 658 1658 www outdoorlivingtoday com sales outdoorlivingtoday com Page 8 8 Lay out all the wall panels and become famil iar wit...

Page 9: ...ogether Pilot Hole first 9 Starting with Solid Wall Panels carefully lay panel face down Position and attach a Bottom Wall Plate to bottom of wall studs of each wall panel with 3 2 1 2 Screws Position...

Page 10: ...ing flush with floor framing Position panel so vertical 2x3 framing sits flush with rear wall framing When both wall panels are positioned correctly attach together at top middle and bottom of vertica...

Page 11: ...11 15 17 Position and attach both Window Walls as per Steps 11 15 18 Attach both Vertical Door Jambs to door opening wall studs with 4 2 1 2 Screws per Jamb Position so jamb is flush with tip of bevel...

Page 12: ...now will make it easier to install roof section 122 19 Attach Door Header to vertical door jambs with 2 2 1 2 Screws per side Header is 3 wide at bottom and has a 1 2 thick x 2 1 2 wide strip of wood...

Page 13: ...sh with outside of floor framing with siding overhanging by approximately 1 2 Confirm 32 wide door opening at bottom When positioned correctly fasten bottom wall plates to floor using 4 2 1 2 Screws p...

Page 14: ...will fit between Side Top Plates Attach with 4 2 Screws per plate Complete all other Side Rear Top Plate attachments 23 Place Side Gable Wall so 1x3 framing sits flush with the inside of the Top Plate...

Page 15: ...s 3 Rafter Brackets Double 4 Single 6 25 Locate 1 each Long Short Ridge Boards and attach together with a metal Ridge Board Connector using 8 3 4 Screws Total Length when connected is 105 Connect othe...

Page 16: ...crews x 36 total S3 2 Screws x 36 total 27 Attach completed Ridge Board to ends of both outside Rafters with 2 2 Screws per end Measure and position interior Rafters as illustrated below When position...

Page 17: ...thick x 3 1 2 wide Roof Battens 1 pc 39 long 1 pc 74 long Start with outside 39 and place 1 8 back from end of rafter 39 74 center on rafter 30 Attach 39 long batten with 2 1 1 4 screws to center of...

Page 18: ...ter 3 4 from edge Attach with 1 1 4 screws Pre drill first to prevent end from splitting 33 Attach middle and last outside batten with 1 1 4 screws to complete 2nd row of battens Make sure to position...

Page 19: ...ent of battens to 2nd Rafter Section as per Steps 29 35 With both rafter batten sections complete carefully lift section up with a helper 37 Lift and slide rafter batten section up on over the side wa...

Page 20: ...n gable framing and Soffit will sit approximately 1 8 away from wall panels Rafter should rest on gable framing 39 Slide Rafter Section up until bottom of Ridge Board slips into gable notch Gable Notc...

Page 21: ...there is a gap between Ridge Boards try pushing side walls closer together from outside Walls should be 70 apart at top from inside of wall plate to wall plate To completely secure Ridge Boards place...

Page 22: ...ll Plates is 70 When correct slide gusset up use level to square gusset and attach to rafters with 4 2 screws Complete remaining Gussets 70 across 45 Attach all Single and Double Rafter Brackets where...

Page 23: ...tached 47 Attach remaining rear facia pieces as per Step 46 Make sure end of facia is even with end of batten This may cause a slight gap in the middle where pieces meet but will be covered later 48 L...

Page 24: ...he right illustration 51 Place remaining 3rd and 4th metal roof panels on rafters as per Steps 48 50 On the ends panel should overhang the battens approximately by 2 on both ends Adjust as necessary O...

Page 25: ...Nut Driver included secure outside panel down to each each batten Metal screw is self tapping Do not over tigthen 54 Use 10 metal screws for side 5 more screws to complete Metal Ridge Caps in later s...

Page 26: ...res will prevent moisture from coming in from the top Complete both sides 57 Place Metal Ridge Caps 3 pieces 60 long on apex of roof Evenly space from front to back Caps will overlap each other Overha...

Page 27: ...orlivingtoday com Page 27 Rear Wall Narrow Trim 2 Side Facia 4 Pentagon Facia Plate 2 Horizontal Gable Trim 4 Side Wall Narrow Trim 2 Bottom Skirting 10 Filler Trim 8 Wide Corner Trim 4 Corner Trim 4...

Page 28: ...ting will hide floor framing Gaps on side will be covered by Wide Trim pieces later Start with Front and Rear Skirting pieces first and attach with 4 1 1 2 Finishing Nails per piece Parts Bottom Skirt...

Page 29: ...t corners start with a Corner Trim align tight underneath Soffit and Rafter Align Wide Corner Trim with bottom of Corner Trim Corner Trim will cap the Wide Corner Trim Do a dry run in each corner befo...

Page 30: ...rner Trim 64 Attach Horizontal Gable Trims to both sides of shed 2 per side Position over flashing where the gables and walls meet Orient thick end of Bevel downward Butt ends tight against Wide Corne...

Page 31: ...piece to secure Parts Rear Wall Narrow Trim 1 2 x 2 1 2 x 79 x 2 Hardware N1 1 1 2 Finishing Nails x 16 total Align with bottom of Horizontal Gable Trim 66 Attach both Side Wall Narrow Trims where wal...

Page 32: ...he shed Parts Facia Nailing Strips 3 4 x 2 1 2 x 44 1 2 x 4 Hardware S2 1 1 4 Screws x 12 total 68 Attach Side Facia to end of roof panel plywood and Nailing Strip Line Facia up to form a peak and att...

Page 33: ...le Detail Plates to cover seams where Horizontal Gable Trims meet Secure with 4 1 1 2 Finishing Nails per piece Parts Pentagon Facia Plates 1 2 x 5 1 2 x 8 x 2 Facia Detail Plates 1 2 x 3 1 2 x 8 x 2...

Page 34: ...th barrel nudged to end of trim Use 2 3 4 Black Headed Screws as shown above Parts Steps 72 74 Dutch Door Top 31 1 2 x 30 x 1 Dutch Door Bottom 31 1 2 x 42 x 1 Hardware Steps 72 74 Y1 Tee Hinges x 4 t...

Page 35: ...ut 1 8 apart On the inside horizontal door frames should be about 1 4 apart Use a shim once again to help you Attach hinges to trim with 2 Black Headed Screws provided 2 Screws 3 4 Screw Important Dri...

Page 36: ...rews to secure Refer to Step 77 to allow for adequate clearance Hardware Y5 Silver Barrel Bolt x 1 total SS2 3 4 Silver Screws x 6 total 77 Attach Interior Door Stops to door framing Jambs and Header...

Page 37: ...only Parts Window Inserts x 2 Hardware S2 1 1 4 Screws x 12 total 79 Once Insert is attached caulk the triangular gap between the Insert s outside flange and the siding Also put a bead of caulking ho...

Page 38: ...luded Position completed Flower Box below bottom of window trim and secure with 2 2 Screws per box Screw from inside of box into the center wall stud Attach second screw 2 underneath first screw and o...

Page 39: ...on and secure wall panels For Door on left side align and attach two Window Wall Panels in center and right positions For Door on right side configure Window Walls on opposite side B With walls positi...

Page 40: ...may be downloaded or copied provided that ALL copies retain the copyright and any other proprietary notices contained on the materials No material may be modified edited or taken out of context such t...

Reviews: