24
4.
Put the cap on LEO gas inlet port with icon
(see Figure 28) and press on
Continue
(see Figure 29
a). Wait
stabilization
time (see Figure 29 b), during this time the pump is not running. Wait until the
Leakage evaluation
step is completed (see Figure 29 c).
3
Figure 28. Put the cap on LEO gas inlet port.
a
b
c
Figure 29. How to set Pump Leak Test
–
stabilization and Leakage evaluation steps (a
–
b
–
c).
If the Leak test is passed, the pump works properly. The green label showing
OK
appears as in Figure 30.
Summary of Contents for LEO
Page 1: ...LEO Handheld Analyzer for IVF Applications Manual IST1446_REV05 SV 3 1 64 0 ...
Page 2: ...This page was left blank ...
Page 16: ...12 Figure 13 Pump ...
Page 84: ...80 Figure 110 T1 Calibration Factory Reset a b b a ...
Page 88: ...84 f e c a b d 2 1 1 Figure 114 CO2 O2 MODULE insertion ...
Page 92: ...88 f e c a b d 2 1 1 Figure 118 CO2 O2 MODULE insertion after pump replacement ...