Do not use Teflon tape in piping.
If burner start-up fails consecutively two times, do not restart burner
before carefully investigating the reason for the failure.
Do not touch hot pipes or surfaces during operation or maintenance.
Emergency shutdown
In an emergency, cut off power supply to the burner. Close the manual shut-off
valves. After safety check you can restart the burner. Check settings, and monitor that
operation continues as normal.
Take care of the boiler room
Never use open fire while checking burner or boiler.
Do not store any inflammable materials in boiler room.
Keep boiler door closed while starting burner, and during burner
operation.
● Maintain tidiness in boiler room, and keep boiler room door closed.
● Make sure that there is always enough water and pressure in heating system.
● Make sure boiler and chimney are swept regularly.
● Check flue damper adjustment and gate valve regularly.
● Make sure burner room air-inlet gap is open.
● Make sure shut-off valves on pressure gauges are shut.
● Make sure pipeworks tightness, boiler system safety appliances, pipeworks, and
burner are checked regularly according to the rules and regulations of public
authorities.
● Check boiler and its components.
We recommend a maintenance contract.
WARNING
IF YOU SMELL GAS, OPEN WINDOW, EXTINGUISH ANY OPEN FLAMES,
STAY AWAY FROM ELECTRICAL SWITCHES, EVACUATE THE BUILDING AND
IMMEDIATELY CALL THE GAS COMPANY.
IN ACCORDANCE WITH OSHA STANDARDS, ALL EQUIPMENT, MACHINES AND
PROCESSES SHALL BE LOCKED OUT PRIOR TO SERVICING.
M5178 1647EN
7 (129)
Summary of Contents for GKP-350 M
Page 2: ......
Page 5: ...6 15 Burner part list 129 M5178 1647EN 3 129...
Page 6: ...4 129 M5178 1647EN...
Page 18: ...Block diagram of contact links Block diagram ver 5 16 129 M5178 1647EN...
Page 100: ...5 5 Time sequence diagram gas use Time sequence diagram G ver 3 98 129 M5178 1647EN...
Page 101: ...Time sequence diagram Gp1 ver 5 M5178 1647EN 99 129...
Page 132: ...130 129 M5178 1647EN...
Page 133: ......