INSTRUCTION MANUAL
19
1. PREPARING THE MACHINE:
1.1. Place the machine on a flat and stable surface.
1.2. Loosen the locking knobs (9) and position the turbine vertically
1.3. Now tighten the locking knobs (9).
1.4. Loosen and remove the fastening screws (12) of the head which is attached to the
SIROCCO machine and remove the head.
2. ATTACHING THE HEAD AND POSITIONING THE MACHINE:
2.1. Attach the SIROCCO SNOW head to the turbine as shown in picture 2 using the
fastening screws (12).
2.2. Once the head is attached you can place the machine in its working location either
directly on a flat and stable surface, or on a tripod also resting on a flat and stable surface
and fitting it into the tripod accomodation (10), or even better on the flightcase we propose,
by inserting the tube piece included with the flightcase into its accommodation for tripod.
Using a tripod or the flightcase tripod, allows you to rotate the machine, covering thus a
larger área.
2.3. Make sure that the tripod is rustproof, that it can bear up to 50kg and that it has
enough leg span to give it stability (minimum 100cm between legs). The height of the
ASSEMBLY AND OPERATION
7
17
19
13
9
18
6
12
8
11
10
26
27
28
24
21
22
23
20
Picture 5
29
30
Picture 4
25
Picture 2