
OETIKER ELK 02 V2.X
4
Process description
Issue 05.2021
08903352
4-21
NOTICE
In order to ensure uniform and reproducible process quality it is mandatory to perform an assembly tool pincer
test at least once per shift, minimum daily. Furthermore, a pincer test is mandatory in the event any pincer
components are replaced.
To maintain consistent pincer force, sufficient compressed air pressure and volume must be provided.
After pincer test, Oetiker recommends verifying the closing force as a secondary validation.
It is essential to ensure clamp closures are not conducted in pincer test mode.
Summary of Contents for ELK 02 Series
Page 144: ...Blank page ...