INSTALLATION | Appliance installation
28
www.ochsner.com | 982000-AIR-M2-M4-EN03.1
11_02_200_214_01_01
1
»
Slide the right-hand appliance casing panel down
from the top along the frame of the appliance, until
the panel clicks into place at the bottom.
»
Ensure that the panel is fully engaged at the three
points along the bottom.
»
Secure the appliance casing with screws at the fixing
points provided, inside the control box.
»
Secure the appliance casing with screws at the rear
of the indoor unit.
11_02_200_214_01_006
10.2 Installing the outdoor unit
10.2.1 Delivery and transportation
The appliance is delivered on a one-way pallet, wrapped
in film.
The appliance casing is assembled on delivery.
i
Information
Should you notice any transportation damage to
the appliance, you must report such damaged im-
mediately when the delivery is unloaded. Claims
for transportation damage cannot be made sub-
sequently.
Material damage
»
Protect the appliance from damage by using
transport belts.
»
When transporting, protect the appliance from
impact.
►
The appliance is secured to the one-way (recyclable)
pallet of the transport packaging with screws.
►
The transport packaging or one-way pallet is suitable
for transportation using a forklift truck.
►
For level transportation to the installation location, the
appliance may remain in the transport packaging.
►
Leave the appliance in the transport packaging or on
the one-way pallet for lifting and moving by crane or
forklift.
►
The standard packaging of the appliance does not
provide protection against the weather or sea water.
►
The appliance may be stored and transported only at
temperatures of between -20°C and +45°C.
►
The appliance must be stored in its transport
packaging.
Please note the following when removing the transport
packaging:
11_02_200_504_01_007
»
Remove the transport packaging.