Before making copies
3
CS230 (Phase 3)
3-49
4
For paper exceeding A3 size, adjust
the trailing-edge guides as shown in
the illustration.
5
Load the paper into the drawer so
that the side of the paper to be
printed on (the side facing up when
the package was unwrapped) faces
up.
–
Load letterhead paper so that the
side to be printed on faces down.
?
How is curled paper loaded?
%
Flatten the paper before loading
it.
?
How many sheets of paper and
other media can be loaded?
%
No more than 250 sheets of plain paper can be loaded. In addition,
no more than 20 sheets of thick paper, 20 overhead projector
transparencies, 20 postcards, 20 label sheets, or 10 envelopes can
be loaded.
%
Do not load so many sheets of plain paper that the top of the stack
is higher than the
,
mark.
6
Close the paper drawer for the 1st drawer.
Trailing-edge guide
,
mark
Summary of Contents for CS230 Phase 3
Page 1: ...Oc CS230 Phase 3 User s Guide Copy operations...
Page 17: ...1 Introduction...
Page 18: ......
Page 42: ...1 Introduction 1 26 CS230 Phase 3 Y G B R M C...
Page 53: ...Introduction 1 CS230 Phase 3 1 37 Full color copy and Background Color function...
Page 61: ...2 Installation and operation precautions...
Page 62: ......
Page 78: ...2 Installation and operation precautions 2 18 CS230 Phase 3...
Page 79: ...3 Before making copies...
Page 80: ......
Page 143: ...4 Basic copy operations...
Page 144: ......
Page 170: ...4 Basic copy operations 4 28 CS230 Phase 3 3 Touch Thick Original...
Page 193: ...Basic copy operations 4 CS230 Phase 3 4 51 3 Touch OK The Basic screen appears again...
Page 242: ...4 Basic copy operations 4 100 CS230 Phase 3 3 Touch OK The Basic screen appears again...
Page 247: ...5 Additional copy operations...
Page 248: ......
Page 250: ...5 Additional copy operations 5 4 CS230 Phase 3 The Mode Check screen appears...
Page 288: ...5 Additional copy operations 5 42 CS230 Phase 3...
Page 289: ...6 Troubleshooting...
Page 290: ......
Page 340: ...6 Troubleshooting 6 52 CS230 Phase 3...
Page 341: ...7 Specifications...
Page 342: ......
Page 352: ...7 Specifications 7 12 CS230 Phase 3...
Page 353: ...8 Copy paper Original documents...
Page 354: ......
Page 383: ...9 Application functions...
Page 384: ......
Page 469: ...10 Replacing toner cartridges and staples and emptying waste containers...
Page 470: ......
Page 509: ...11 Care of the machine...
Page 510: ......
Page 520: ...11 Care of the machine 11 12 CS230 Phase 3...
Page 521: ...12 Managing jobs Job list...
Page 522: ......
Page 540: ...12 Managing jobs Job list 12 20 CS230 Phase 3...
Page 541: ...13 Utility...
Page 542: ......
Page 664: ...13 Utility 13 124 CS230 Phase 3...
Page 665: ...14 Appendix...
Page 666: ......
Page 675: ...Appendix 14 CS230 Phase 3 14 11 Z Zoom Specify the zoom ratio of the copy...