Expose the lower case fixings by lowering the door in the front of case. This is
done by pressing the release lever through the hole in the underside of the ca
se.
Locate the holes in the case over the threaded studs attached to the combusti
on chamber front panel and secure using two M5 nuts from accessory pack C.
Page 17
COMMISSIONING - Page 18
FIG. 18. FITTING BOILER CASE
User’s Instructions
A
user’s instruction leaflet is provided with this boiler but the householder mus
t have the operation of the boiler and system explained by the installer. The h
ouseholder mustalso be advised of the importance of annual servicing, and of
the precautions necessary to prevent damage to the system and building, in th
e event of the system remainingout of commission in frost conditions.
Page 18
Summary of Contents for CF 20/35
Page 4: ......
Page 5: ...Page 4 INSTALLATION DATA Page 5 FIG 2 GENERAL ARRANGEMENT...
Page 6: ...Page 5...
Page 43: ...Page 25...