background image

 

TWO POST SPL10000 

Nussbaum Automotive Solutions, LP | 1932 Jordache Court, Gastonia, NC 28052 | 704.864.2470 | Email: 

[email protected]

 | us.nussbaumlifts.com  

 

OWNER/EMPLOYER RESPONSIBILITIES 

AUTOMOTIVE LIFT INSTITUTE SAFETY REQUIREMENTS FOR OPERATION, INSPECTION AND 

MAINTENANCE (ANSI/ALI ALOIM) 

The Owner/Employer shall insure that lift operators are qualified and that they are trained in the safe use and operation 
of the lift: ALI/SM 93-1, ALI Lifting it Right safety manual; ALI/ST-90 ALI Safety Tips card; ANSI/ALI ALOIM-2000, American 
National Standard for Automotive Lifts-Safety Requirement for Operation, Inspection and Maintenance; ALI/WL Series, 
ALI Uniform Warning Label Decals/Placards; and in case of frame engaging lifts, ALI/LP-GUIDE, Vehicle Lifting 
Points/Quick Reference Guide for Frame Engaging Lifts and SAE J2184, Vehicle Lifting Points for Service Garage Lifting. 

The Owner/Employer shall establish procedures to periodically inspect the lift in accordance with the lift manufacturer’s 
instructions or ANSI/ALI ALOIM-2000, American National Standard for Automotive Lifts-Safety Requirements for 
Operation, Inspection and Maintenance; and the employer shall insure that the lift inspectors are qualified and that they 
are adequately trained in the inspection of the lift. 

The Owner/Employer shall establish procedures to periodically maintain the lift in accordance with the lift 
manufacturer’s instructions or ANSI/ALI ALOIM-2000, American National Standard for Automotive Lifts-Safety 
Requirements for Operation, Inspection and Maintenance; and the employer shall insure that the lift maintenance 
personnel are qualified and that they are adequately trained in the maintenance of the lift. 

The Owner/Employer shall maintain the periodic inspection and maintenance records recommended by the 
manufacturer or ANSI/ALI ALOIM-2000, American National Standard for Automotive Lifts-Safety Requirements for 
Operation, Inspection and Maintenance. 

The Owner/Employer shall display the lift manufacturer’s operating instructions; : AL;/SM 93-1, ALI Lifting it Right safety 
manual; ALI/ST-90 ALI Safety Tips card; ANSI/ALI ALOIM-2000, American National Standard for Automotive Lifts-Safety 
Requirement for Operation, Inspection and Maintenance; ALI/WL Series, ALI Uniform Warning Label Decals/Placards; 
and in case of frame engaging lifts, ALI/LP-GUIDE, Vehicle Lifting Points/Quick Reference Guide for Frame Engaging Lifts; 
in a conspicuous location in the lift area convenient to the operator. 

ADDITIONAL OWNER/EMPLOYER RESPONSIBILITIES 

 

Shall require that Personal Protective Equipment (PPE) be used according to the appropriate regulations. 

 

Shall display the “Safety Regulations” and adhere to them closely. 

 

Shall ensure that all safety- and danger signs on and around the Lift are observed and followed! 

 

Shall follow the specified time intervals between the recommended inspection and maintenance procedures 

and tests. 

 

Shall use only spare parts that comply with the technical requirements specified by the manufacturer.    

 

Shall ensure that loose screws, nuts, and bolts are firmly tightened after maintenance. 

 

Shall not modify the Lift without written consent of Nussbaum Automotive Solutions, LP. 

 

Shall ensure that these instructions are maintained and available to all personnel that install, use or maintain the 

lift. This document contains important information about installation, operation, and maintenance of the 

automotive Lift.  Any changes to the installation and or location of the automotive Lift must be documented. 

 

 

Summary of Contents for SPL 10 Series

Page 1: ......

Page 2: ...ST THE LIFT BE CLEANED 10 LIFT MAINTENANCE 11 TECHNICAL INFORMATION 12 GENERAL MEASUREMENTS 13 GENERAL VIEWS 14 HYDRAULIC PLAN 15 ELECTRIC PLAN 16 TROUBLE SHOOTING 17 INSTALLATION AND INITIATION 18 SA...

Page 3: ...or any damages injuries or deaths resulting from misuse of the Lift The user carries the risk alone There will be no guarantee or liability for incidents involving injuries death or damage to equipmen...

Page 4: ...equately trained in the maintenance of the lift The Owner Employer shall maintain the periodic inspection and maintenance records recommended by the manufacturer or ANSI ALI ALOIM 2000 American Nation...

Page 5: ...s in case of improper handling Attention This sign indicates an important function or note SAFETY REGULATIONS The Safety Regulations must be observed and strictly adhered to while working with the aut...

Page 6: ...e Lift has been damaged until it has been examined by a qualified service person To reduce the risk of fire do not operate Lift in the vicinity of open containers of flammable liquids gasoline Adequat...

Page 7: ...NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 7 SAFETY LABELS AFFIXED TO LIFT READ ALL LABELS AND VERIFY THAT ALL AUTHORIZED USERS FULLY UNDERSTAND THE MEANING OF EACH CAUTION...

Page 8: ...he vehicle and position the Lift Adapter Pads at the Lift points specified by the vehicle manufacturer The manufacturer s service garage Lift points may be marked on the undercarriage of the vehicle w...

Page 9: ...t the manufacturer s recommended Lift points Raise the vehicle to the required working height only if vehicle is stable on the Lift Always observe the complete lifting and lowering process Engage the...

Page 10: ...ntenance records may be a prerequisite for warranty claims The maintenance rate must be increased if the Lift is in continuous operation in a dirty environment or in contact with de icing salts sand p...

Page 11: ...oil Approximately 4 Gallons If ambient temperature is under 40 degrees Fahrenheit use lower than 32 viscosity Dispose of used oil according to the appropriate regulations Check all welded joints for c...

Page 12: ...utions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 12 REPLACEMENT PARTS ONLY USE NUSSBAUM ORIGINAL EQUIPMENT PARTS TO REPAIR THE LIFT CALL NU...

Page 13: ...learance and screw up adapters DJ Technical Data Standard arms Three stage arms Low profile arms Double jointed arms Lifting Capacity lbs 10 000 10 000 8000 9000 Lifting Time Approx sec 37 37 37 37 Lo...

Page 14: ...TWO POST SPL10000 Nussbaum Automotive Solutions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 14 GENERAL MEASUREMENTS...

Page 15: ...TWO POST SPL10000 Nussbaum Automotive Solutions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 15 GENERAL VIEW...

Page 16: ...Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 16 HYDRAULIC PLAN 0 1 OIL TANK 0 7 HOLDING VALVE 0 2 MOTOR 3KW 0 8 PRESSURE RELIEF VALVE 0 3 GEAR PUMP 0 9 HOLDING VALV...

Page 17: ...ts com 17 ELECTRIC PLAN 1 Open control panel cover 2 Unplug wire connector on terminal 0 of motor control relay 3 Connect male connector from overhead limit switch to female connector on unplugged wir...

Page 18: ...eservoir Check for leakage Call Technical Service if leakage is observed Defective Hydraulic Valve Check for leakage Call Technical Service if leakage is observed Gear Pump is defective Check for leak...

Page 19: ...rained technicians or by the manufacturer s distribution partner The Lift owner may use their trained mechanics to install the Lift The installation must be performed according to the following regula...

Page 20: ...ll to be installed on end of Lowering Lever as part of the handle Plastic Bag 1 94515 06 06 90 Degree 3 8 Fitting Used to connect Hydraulic Line to Motor Plastic Bag 4 9SRD471 Metric Snap Ring 38MM Si...

Page 21: ...ARRY ARM MEASUREMENTS The first measurements shown above the measurement lines are Wide width installation measurements The measurements following the Wide width measurements in parenthesis are Narrow...

Page 22: ...or DO NOT install on unstable surfaces such as asphalt Minimum 3500psi concrete thickness 4 Clean holes with compressed air Insert eight 8 Anchor Bolts in Post 1 and tighten to the Anchor Bolt manufac...

Page 23: ...ost Loop Synchronizing Equalizing Cable 1 back up through the 2 Ratchet Ladder guides to the top hole Place M16 Hex Nut on the end of the Synchronizing Equalizing Cable 1 Repeat steps 3 9 for Synchron...

Page 24: ...structions provided on the label inside the cover of the Power Unit Connect the marked Supply Cables Top limit Switch red male and female wires inside power supply box to the Owner provided 240V Power...

Page 25: ...rm Slide Lift Carry Arm into Yoke and install Swivel Arm Pin Attach the second C Clip at the bottom of the Pin to secure into place Repeat with all Lift Carry Arms Raise and lower the Lift several tim...

Page 26: ...ype B20 75 B20 100 Drilling depth a 115 140 Min Anchorage depth b 85 85 Thickness of concrete c 180 180 Diameter of bore d 20 20 Thickness of the lift pieces e 0 40 40 65 Number of dowels 8 12 8 12 St...

Page 27: ...PAVEMENT OR TILE SURFACE Dowel type B20 100 B20 125 B20 135 B20 175 Drilling depth a 140 165 175 215 Min Anchorage depth b 85 85 85 85 Thickness of concrete c 180 180 180 180 Diameter of bore d 20 20...

Page 28: ...ng procedures using the ANSI ALI Lifting It Right booklet as a guide 5 Provide the complete lift documentation package to the owner for future reference 6 Complete the Manufacturer s Checklist below a...

Page 29: ...nuts carriage cables Function of the safety locks Condition of the equalization cables Condition of Pulleys Condition of the cylinder covers Condition of the hydraulic hoses tubes Oil level Sealing of...

Page 30: ...nuts carriage cables Function of the safety locks Condition of the equalization cables Condition of Pulleys Condition of the cylinder covers Condition of the hydraulic hoses tubes Oil level Sealing o...

Page 31: ...nuts carriage cables Function of the safety locks Condition of the equalization cables Condition of Pulleys Condition of the cylinder covers Condition of the hydraulic hoses tubes Oil level Sealing o...

Page 32: ...TWO POST SPL10000 Nussbaum Automotive Solutions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 32 NOTES...

Reviews: