MOUNTING LIFTING COLUMNS TO FLOOR 

Post 1 will have the Power Unit Mounting Bracket. 

Mount 

Lift Column 1 on the passenger side of the vehicle

Determine desired location in bay for 

Lift Column 1.   

Allowing ample room 

for Lift width and Lift Column 2 to be installed. Make sure there will 

not be any obstructions within 6” of any post.  Allow at least  

Stand 

Lift Column 1 in upright position. 

Using holes in the Post Baseplate as a guide.  

Drill Holes in concrete floor for a 5 ½” long ¾” diameter 

Heavy Duty Anchor Bolt

The depth of the holes should be ¼” deeper than the length of the 

Anchor Bolt.  

 

 

The Lift is supported only by the anchors in the floor.  DO NOT install on 

unstable surfaces such as asphalt. Minimum 3500psi concrete thickness 4” 

 

Clean holes with 

compressed air

Insert eight (8) Anchor Bolts in Post 1 and tighten to 

 the 

Anchor Bolt manufacturers’ recommended torque. 

 

If Anchors do not tighten to 150 ft-lbs. installation torque, replace 

concrete under each post base with a 4’x4’x8” thick 3500 PSI 

minimum concrete pad.   

 

Confirm that 

Mounting Baseplates are square on centerline. 

Install 

Cables before securing Lift Column 2 to the floor

Place the Overhead Telescope Assembly on top of the Posts. 

 

  

Assure 

Mounting Baseplates are level to each other.   

Use 

shims and non-shrink grout under unsupported areas of each Baseplate as needed.  

Confirm that 

Lift Columns are plumb.  

Drill 

holes for Lift Column 2 as described above and secure.   

Fasten Lift Column 2 with eight (8) Anchor Bolts to the floor.   

Remove the Overhead Telescope Assembly to install Cables. 

 

 

 

 

 

 

 

Post 1 with Power Unit 

Mounting Bracket 

Post Base Plate 

 

Overhead Telescope 

Assembly 

 

Mounting 

Base Plate 

 

Summary of Contents for SPL 10 Series

Page 1: ......

Page 2: ...ST THE LIFT BE CLEANED 10 LIFT MAINTENANCE 11 TECHNICAL INFORMATION 12 GENERAL MEASUREMENTS 13 GENERAL VIEWS 14 HYDRAULIC PLAN 15 ELECTRIC PLAN 16 TROUBLE SHOOTING 17 INSTALLATION AND INITIATION 18 SA...

Page 3: ...or any damages injuries or deaths resulting from misuse of the Lift The user carries the risk alone There will be no guarantee or liability for incidents involving injuries death or damage to equipmen...

Page 4: ...equately trained in the maintenance of the lift The Owner Employer shall maintain the periodic inspection and maintenance records recommended by the manufacturer or ANSI ALI ALOIM 2000 American Nation...

Page 5: ...s in case of improper handling Attention This sign indicates an important function or note SAFETY REGULATIONS The Safety Regulations must be observed and strictly adhered to while working with the aut...

Page 6: ...e Lift has been damaged until it has been examined by a qualified service person To reduce the risk of fire do not operate Lift in the vicinity of open containers of flammable liquids gasoline Adequat...

Page 7: ...NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 7 SAFETY LABELS AFFIXED TO LIFT READ ALL LABELS AND VERIFY THAT ALL AUTHORIZED USERS FULLY UNDERSTAND THE MEANING OF EACH CAUTION...

Page 8: ...he vehicle and position the Lift Adapter Pads at the Lift points specified by the vehicle manufacturer The manufacturer s service garage Lift points may be marked on the undercarriage of the vehicle w...

Page 9: ...t the manufacturer s recommended Lift points Raise the vehicle to the required working height only if vehicle is stable on the Lift Always observe the complete lifting and lowering process Engage the...

Page 10: ...ntenance records may be a prerequisite for warranty claims The maintenance rate must be increased if the Lift is in continuous operation in a dirty environment or in contact with de icing salts sand p...

Page 11: ...oil Approximately 4 Gallons If ambient temperature is under 40 degrees Fahrenheit use lower than 32 viscosity Dispose of used oil according to the appropriate regulations Check all welded joints for c...

Page 12: ...utions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 12 REPLACEMENT PARTS ONLY USE NUSSBAUM ORIGINAL EQUIPMENT PARTS TO REPAIR THE LIFT CALL NU...

Page 13: ...learance and screw up adapters DJ Technical Data Standard arms Three stage arms Low profile arms Double jointed arms Lifting Capacity lbs 10 000 10 000 8000 9000 Lifting Time Approx sec 37 37 37 37 Lo...

Page 14: ...TWO POST SPL10000 Nussbaum Automotive Solutions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 14 GENERAL MEASUREMENTS...

Page 15: ...TWO POST SPL10000 Nussbaum Automotive Solutions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 15 GENERAL VIEW...

Page 16: ...Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 16 HYDRAULIC PLAN 0 1 OIL TANK 0 7 HOLDING VALVE 0 2 MOTOR 3KW 0 8 PRESSURE RELIEF VALVE 0 3 GEAR PUMP 0 9 HOLDING VALV...

Page 17: ...ts com 17 ELECTRIC PLAN 1 Open control panel cover 2 Unplug wire connector on terminal 0 of motor control relay 3 Connect male connector from overhead limit switch to female connector on unplugged wir...

Page 18: ...eservoir Check for leakage Call Technical Service if leakage is observed Defective Hydraulic Valve Check for leakage Call Technical Service if leakage is observed Gear Pump is defective Check for leak...

Page 19: ...rained technicians or by the manufacturer s distribution partner The Lift owner may use their trained mechanics to install the Lift The installation must be performed according to the following regula...

Page 20: ...ll to be installed on end of Lowering Lever as part of the handle Plastic Bag 1 94515 06 06 90 Degree 3 8 Fitting Used to connect Hydraulic Line to Motor Plastic Bag 4 9SRD471 Metric Snap Ring 38MM Si...

Page 21: ...ARRY ARM MEASUREMENTS The first measurements shown above the measurement lines are Wide width installation measurements The measurements following the Wide width measurements in parenthesis are Narrow...

Page 22: ...or DO NOT install on unstable surfaces such as asphalt Minimum 3500psi concrete thickness 4 Clean holes with compressed air Insert eight 8 Anchor Bolts in Post 1 and tighten to the Anchor Bolt manufac...

Page 23: ...ost Loop Synchronizing Equalizing Cable 1 back up through the 2 Ratchet Ladder guides to the top hole Place M16 Hex Nut on the end of the Synchronizing Equalizing Cable 1 Repeat steps 3 9 for Synchron...

Page 24: ...structions provided on the label inside the cover of the Power Unit Connect the marked Supply Cables Top limit Switch red male and female wires inside power supply box to the Owner provided 240V Power...

Page 25: ...rm Slide Lift Carry Arm into Yoke and install Swivel Arm Pin Attach the second C Clip at the bottom of the Pin to secure into place Repeat with all Lift Carry Arms Raise and lower the Lift several tim...

Page 26: ...ype B20 75 B20 100 Drilling depth a 115 140 Min Anchorage depth b 85 85 Thickness of concrete c 180 180 Diameter of bore d 20 20 Thickness of the lift pieces e 0 40 40 65 Number of dowels 8 12 8 12 St...

Page 27: ...PAVEMENT OR TILE SURFACE Dowel type B20 100 B20 125 B20 135 B20 175 Drilling depth a 140 165 175 215 Min Anchorage depth b 85 85 85 85 Thickness of concrete c 180 180 180 180 Diameter of bore d 20 20...

Page 28: ...ng procedures using the ANSI ALI Lifting It Right booklet as a guide 5 Provide the complete lift documentation package to the owner for future reference 6 Complete the Manufacturer s Checklist below a...

Page 29: ...nuts carriage cables Function of the safety locks Condition of the equalization cables Condition of Pulleys Condition of the cylinder covers Condition of the hydraulic hoses tubes Oil level Sealing of...

Page 30: ...nuts carriage cables Function of the safety locks Condition of the equalization cables Condition of Pulleys Condition of the cylinder covers Condition of the hydraulic hoses tubes Oil level Sealing o...

Page 31: ...nuts carriage cables Function of the safety locks Condition of the equalization cables Condition of Pulleys Condition of the cylinder covers Condition of the hydraulic hoses tubes Oil level Sealing o...

Page 32: ...TWO POST SPL10000 Nussbaum Automotive Solutions LP 1932 Jordache Court Gastonia NC 28052 704 864 2470 Email info nussbaum usa com us nussbaumlifts com 32 NOTES...

Reviews: