Operating Instruction and Documentation
4.50 SL
- 44 -
• Open the electrical box.
• Press the button (see pic 5) and hold it pressed and press simultaneously the button „lifting“
until the lift stops at the reference point. Turn off the main switch.
pic 5: button „reference point“
The reference point is marked at every column. Examine the points with the carriage.
In case the level of the carriage and the reference point is not on the same height, level out
manually the carriage at the spindle until the level is ok. In this case the main switch must be
turned off.
Remove the cover at the top of the columns and turn the spindle with a suitable tool until
the carriage is on the „reference point“.
switch power back and push on the keypad # enter 1234 and #, with the * go to
menu point "reference point" and enter #
now confirm with # again.
push * several times to get to the menu point "return" and confirm with #
finished.
7. Inspection and Maintenance
Before conducting maintenance work, preparations must be made to ensure that
during maintenance and repair work there is no risk to the safety of people working on
or around the lift and also that there is no risk of damage to equipment being used on
or around the lift.
German legal guidelines : BSV (Prescription of working tools) + BGR500 (Work with
working tools)
To guarantee the utmost availability and to ensure that the lift remains functional,
maintenance work contracts are organised between our clients and their local retailers.
A service must be performed at regular intervals of 3 months through the operator in
accordance with following service manual. If the lift is in continuous operation or in a dirty
environment, the maintenance rate must be increased.
During daily operation the lift must be closely observed to ensure that it is functioning
correctly. In the case of malfunction or leakage the technical service must be informed.
7.1 Maintenance plan of the lift
Before beginning any maintenance work isolate the power supply. Secure the main switch
(lock it). Secure the danger area around the automotive lift and secure the lift against
unintentional lowering.
a
Grease the spindle bearing annually with a multipurpose fat.
Remove the cover of the spindle (see g).
Summary of Contents for 4.50 SL
Page 9: ...Operating Instruction and Documentation 4 50 SL 9 2 5 Declaration of conformity...
Page 10: ...Operating Instruction and Documentation 4 50 SL 10 3 Technical Information...
Page 12: ...Operating Instruction and Documentation 4 50 SL 12 3 3 Data sheet...
Page 13: ...Operating Instruction and Documentation 4 50 SL 13 3 4 Foundation diagram drawing...
Page 14: ...Operating Instruction and Documentation 4 50 SL 14 3 5 Electrical diagram drawing...
Page 15: ...Operating Instruction and Documentation 4 50 SL 15...
Page 16: ...Operating Instruction and Documentation 4 50 SL 16...
Page 17: ...Operating Instruction and Documentation 4 50 SL 17...
Page 18: ...Operating Instruction and Documentation 4 50 SL 18...
Page 19: ...Operating Instruction and Documentation 4 50 SL 19...
Page 20: ...Operating Instruction and Documentation 4 50 SL 20...
Page 21: ...Operating Instruction and Documentation 4 50 SL 21...
Page 22: ...Operating Instruction and Documentation 4 50 SL 22...
Page 23: ...Operating Instruction and Documentation 4 50 SL 23...
Page 24: ...Operating Instruction and Documentation 4 50 SL 24...
Page 25: ...Operating Instruction and Documentation 4 50 SL 25...
Page 26: ...Operating Instruction and Documentation 4 50 SL 26...
Page 27: ...Operating Instruction and Documentation 4 50 SL 27...
Page 28: ...Operating Instruction and Documentation 4 50 SL 28...
Page 29: ...Operating Instruction and Documentation 4 50 SL 29...
Page 30: ...Operating Instruction and Documentation 4 50 SL 30...
Page 31: ...Operating Instruction and Documentation 4 50 SL 31...
Page 32: ...Operating Instruction and Documentation 4 50 SL 32...
Page 33: ...Operating Instruction and Documentation 4 50 SL 33...
Page 34: ...Operating Instruction and Documentation 4 50 SL 34...
Page 35: ...Operating Instruction and Documentation 4 50 SL 35...
Page 36: ...Operating Instruction and Documentation 4 50 SL 36...
Page 37: ...Operating Instruction and Documentation 4 50 SL 37...