Operating Instruction and Documentation
4.50 SL
- 50 -
8.1.1 Erection and doweling of the lift
Before installation the lift, secure the installation area to prevent access to
unauthorised persons. Use devices such as cranes, fork lift trucks and supports to
transport the lift and avoid accidents.
Before installation of the lift create a sufficiently concrete by customer. The operator is
responsible for the installation place. A concrete with a quality of minimum C20/25 and a
thickness without tiles and floor pavement is necessary (thickness => see the foundation
drawing).
We point out the minimum requirement of the foundation in our plans. The condition of the local
realities (for example: the ground under the foundation) does not lie in our responsibility. The
execution of the installation situation must be individually specified by the planning architect or by
the engineer engaged in statically calculations in the special case.
In case of doubt a test boring has to be performed and a dowel is to set in. Afterwards the dowel
is tighten with a torque which is described of the dowel manufacturer.
If there are defectives (cracks or hairline cracks) in the zone of influence Ø200 mm, the
foundation cannot be used to install the lift on it.
Nr
Aenderung
Datum
Name Urspr.
Ersatz fuer:
Ersatz durch:
-
-
Zeichnungsnummer
450SL20015
von
7
Blatt
1
Benennung
450SL BMW 4600/630
Norm
Gepr.
Bearb.
24.04.12
M.A
Datum
Name
Masse ohne
Toleranzangaben
DIN ISO
2768 mH
Werkstoff / Halbzeug
- ; -
Massstab:
0.040
Gewicht:
3038.162 kg
pic 19: complete automotive-lift
Summary of Contents for 4.50 SL
Page 9: ...Operating Instruction and Documentation 4 50 SL 9 2 5 Declaration of conformity...
Page 10: ...Operating Instruction and Documentation 4 50 SL 10 3 Technical Information...
Page 12: ...Operating Instruction and Documentation 4 50 SL 12 3 3 Data sheet...
Page 13: ...Operating Instruction and Documentation 4 50 SL 13 3 4 Foundation diagram drawing...
Page 14: ...Operating Instruction and Documentation 4 50 SL 14 3 5 Electrical diagram drawing...
Page 15: ...Operating Instruction and Documentation 4 50 SL 15...
Page 16: ...Operating Instruction and Documentation 4 50 SL 16...
Page 17: ...Operating Instruction and Documentation 4 50 SL 17...
Page 18: ...Operating Instruction and Documentation 4 50 SL 18...
Page 19: ...Operating Instruction and Documentation 4 50 SL 19...
Page 20: ...Operating Instruction and Documentation 4 50 SL 20...
Page 21: ...Operating Instruction and Documentation 4 50 SL 21...
Page 22: ...Operating Instruction and Documentation 4 50 SL 22...
Page 23: ...Operating Instruction and Documentation 4 50 SL 23...
Page 24: ...Operating Instruction and Documentation 4 50 SL 24...
Page 25: ...Operating Instruction and Documentation 4 50 SL 25...
Page 26: ...Operating Instruction and Documentation 4 50 SL 26...
Page 27: ...Operating Instruction and Documentation 4 50 SL 27...
Page 28: ...Operating Instruction and Documentation 4 50 SL 28...
Page 29: ...Operating Instruction and Documentation 4 50 SL 29...
Page 30: ...Operating Instruction and Documentation 4 50 SL 30...
Page 31: ...Operating Instruction and Documentation 4 50 SL 31...
Page 32: ...Operating Instruction and Documentation 4 50 SL 32...
Page 33: ...Operating Instruction and Documentation 4 50 SL 33...
Page 34: ...Operating Instruction and Documentation 4 50 SL 34...
Page 35: ...Operating Instruction and Documentation 4 50 SL 35...
Page 36: ...Operating Instruction and Documentation 4 50 SL 36...
Page 37: ...Operating Instruction and Documentation 4 50 SL 37...