Operating Instruction and Documentation
4.50 SL
- 52 -
• Lift or lower the carriage to medium height.
• Take away current supply from the lift.
• If necessary remove the ascending pipe and the traverse.
• Remove the cover of the lift.
• Disconnect the plugs.
• Loosen the dowels.
• Dismount the columns.
• Dismount the crossbeams.
• Transport the lift to the new installation place.
• Install the lift in accordance with chapter 8 “ Installation and Initiation”
Use new dowels, the used dowels can not be used anymore.
A security check must be performed before re initiation by a competent person. Use the sheet
“Regular security check”.
8.4 Key in the reference point with the keyboard
After mounting and adjusting of the lift and platforms, raise the lift on a comfortable working
height. (e.g. approx. 1250mm)
Position the arrow sticker at the lifting carriage and the column after entering of the new reference
point. (see the drawing)
Function button:
<
*
> (star): back to the position display
<
#
> (lozenge): confirm button
• Measure the distance (X) between the lower edge of the lifting carriage and the upper side of the
base plate. Carry out the procedure at all four columns.
lozenge -button
star-button
Display
Summary of Contents for 4.50 SL
Page 9: ...Operating Instruction and Documentation 4 50 SL 9 2 5 Declaration of conformity...
Page 10: ...Operating Instruction and Documentation 4 50 SL 10 3 Technical Information...
Page 12: ...Operating Instruction and Documentation 4 50 SL 12 3 3 Data sheet...
Page 13: ...Operating Instruction and Documentation 4 50 SL 13 3 4 Foundation diagram drawing...
Page 14: ...Operating Instruction and Documentation 4 50 SL 14 3 5 Electrical diagram drawing...
Page 15: ...Operating Instruction and Documentation 4 50 SL 15...
Page 16: ...Operating Instruction and Documentation 4 50 SL 16...
Page 17: ...Operating Instruction and Documentation 4 50 SL 17...
Page 18: ...Operating Instruction and Documentation 4 50 SL 18...
Page 19: ...Operating Instruction and Documentation 4 50 SL 19...
Page 20: ...Operating Instruction and Documentation 4 50 SL 20...
Page 21: ...Operating Instruction and Documentation 4 50 SL 21...
Page 22: ...Operating Instruction and Documentation 4 50 SL 22...
Page 23: ...Operating Instruction and Documentation 4 50 SL 23...
Page 24: ...Operating Instruction and Documentation 4 50 SL 24...
Page 25: ...Operating Instruction and Documentation 4 50 SL 25...
Page 26: ...Operating Instruction and Documentation 4 50 SL 26...
Page 27: ...Operating Instruction and Documentation 4 50 SL 27...
Page 28: ...Operating Instruction and Documentation 4 50 SL 28...
Page 29: ...Operating Instruction and Documentation 4 50 SL 29...
Page 30: ...Operating Instruction and Documentation 4 50 SL 30...
Page 31: ...Operating Instruction and Documentation 4 50 SL 31...
Page 32: ...Operating Instruction and Documentation 4 50 SL 32...
Page 33: ...Operating Instruction and Documentation 4 50 SL 33...
Page 34: ...Operating Instruction and Documentation 4 50 SL 34...
Page 35: ...Operating Instruction and Documentation 4 50 SL 35...
Page 36: ...Operating Instruction and Documentation 4 50 SL 36...
Page 37: ...Operating Instruction and Documentation 4 50 SL 37...