Operating Instruction and Documentation
2.30 SL E
- 23 -
B) without using traverse and ascending pipe (under floor)
• It is possible to lay the cable under the floor.
• Do not need the traverse and the ascending pipe.
• Make a foundation in accordance with the drawing. The opening for the cable is in
the base plate of the lift.
• Pay attention to the cable if you mount the column.
• Lay the cable before positioning of the column through the empty pipe.
Move the column to the installation place. Lay the cable through the hole in the base
plate to the head plate of the column. Build the column. Pay attention the cables.
• Connect the cables (Plugs) in accordance with the drawing.(pic.19)
• Pay attention the cables does not touches the rotating parts.
• Observe the secure contact between the plugs.
pic.19 cable run without traverse and ascending pipe
8.1.3 Installation the carrying arms
• Install carrying arms and bolts top and bottom with enclosed circlips.
The carrying arms must be secured at both sides, otherwise a correct connection
between the lift carriage and the carrying arm can not be guaranteed.
• Lift and lower the lift with vehicle several times, tighten dowels a second time with
the correct torque. (Liebig 80 Nm)
Summary of Contents for 2.30 SL E
Page 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Page 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Page 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Page 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Page 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...