Operating Instruction and Documentation
2.30 SL E
- 24 -
8.2 Initiation
Before the initiation a security check must be performed. therefore use
form: First security check.
If the lift is installed by a competent person, he will perform this security check. If
the operator installs the lift by himself, he has to instruct a competent person to
perform the security check.
The competent confirms the faultless function of the lift in the installation record and
form for the security check and allows the lift to be used.
Please send the filled installation record to the manufacturer after
installation.
8.3 Changing the installation place
If the place of installation shall be changed, the new place has to be prepared in
according to the regulations of the first installation. The changing should be
performed in accordance with the following points:
• Lift or lower the carriage to medium height.
• Take away current supply from the lift.
• Remove the cover of the lift.
• Dismount the carrying arms.
• Disconnect the plugs.
• If necessary remove the ascending pipe and the traverse.
• Loosen the dowels.
• Install the lift in accordance with chapter 8 “ Installation and Initiation”
Use new dowels, the used dowels can not be used anymore.
A security check must be performed before reinitiation by a competent person. Use
form “Regular security check”.
9. Security check
The security check is necessary to guarantee the safety of the lifting during use. It
has to be performed in the following cases:
1. Before the initial operation, after the first installation
Use the form “First security check before initiation”
2. In regular intervals after the initial operation, at least annually.
Use the form “Regular security check at least annually”
3. Every time the construction of that particular lift has been changed.
Use the form “Extraordinary security check”
The first and the regular security check must be performed by a competent
person. It is recommended to service the lift at this occasion.
Summary of Contents for 2.30 SL E
Page 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Page 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Page 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Page 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Page 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...