Operating Instruction and Documentation
2.30 SL E
- 32 -
Pic. 22: choice of the dowel length without floor pavement or tile surface
Table to picture 22.
Dowel type
Liebig B20; UPAT UMV 100 (or UMV80 for version with base
frame bow) or equal dowels of other manufacturer (with licence)
Drilling depth
a according to dowel manufacturer
Min. anchorage depth b 100 mm (80 mm for version with base frame bow)
Thickness of concrete c at least 200 mm (or at least 150 mm for version with base frame)
Diameter of bore
d according to the dowel manufacturer
Thickness of the
lift-pieces
e = 15mm
starting torque
according to dowel manufacturer
number of dowels
12 piece (16 piece by using additional installation strap)
Summary of Contents for 2.30 SL E
Page 13: ...Operating Instruction and Documentation 2 30 SL E 13...
Page 26: ...Operating Instruction and Documentation 2 30 SL E 26 Datasheet...
Page 27: ...Operating Instruction and Documentation 2 30 SL E 27...
Page 30: ...Operating Instruction and Documentation 2 30 SL E 30 Block foundation plan 3400...
Page 33: ...Operating Instruction and Documentation 2 30 SL E 33 Electrical diagram drawing...