![NR Electric PCS-978 Instruction Manual Download Page 431](http://html1.mh-extra.com/html/nr-electric/pcs-978/pcs-978_instruction-manual_1713963431.webp)
10 Communication
PCS-978 Transformer Relay
10-11
Date: 2013-01-16
Client
IED (Server)
Report Control Block
Report Instance 1
RptEna = false
Net A
Net B
Report Instance 2
RptEna = true
Client
IED (Server)
Report Control Block
Report Instance 1
RptEna = true
Net A
Net B
Report Instance 2
RptEna = true
TCP Link
MMS Link
Figure 10.5-3 Dual-net full duplex mode with 2 independent RCB instances
In mode 3, IED provides 2 report instances for each RCB, Net A and Net B work independently
from each other, failures of one net will not affect the other net at all.
In this mode, 2 report instances are required for each client. Therefore, the IED may be unable to
provide enough report instances if there are too many clients.
Net A and Net B send the same report separately when they operates normally, To ensure no
repeated data is saved into database, massive calculation is required for the client.
Moreover, accurate clock synchronization of the IED is required to distinguish whether 2 reports
are the same report according to the timestamps. Clock synchronization error of the IED may lead
to report loss/redundancy.
As a conclusion:
In mode
2, it’s difficult to realize seamless switchover between dual nets;
In mode 3, the IED may be unable to provide enough report instances if too many clients are
applied on site.
For the consideration of client treatment and IED implementation, mode 1 (Dual-net full duplex
mode sharing the same report instance) is recommended for MMS communication network
deployment.
10.5.4 Server Data Organization
IEC61850 defines an object-oriented approach to data and services. An IEC61850 physical device
can contain one or more logical device(s) (for proxy). Each logical device can contain many logical
nodes. Each logical node can contain many data objects. Each data object is composed of data
attributes and data attribute components. Services are available at each level for performing
Summary of Contents for PCS-978
Page 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Page 2: ......
Page 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Page 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Page 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Page 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Page 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Page 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Page 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Page 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Page 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Page 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Page 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Page 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Page 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Page 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Page 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Page 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Page 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Page 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Page 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Page 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Page 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...