![NR Electric PCS-978 Instruction Manual Download Page 172](http://html1.mh-extra.com/html/nr-electric/pcs-978/pcs-978_instruction-manual_1713963172.webp)
3
Operation
Theory
PCS-978 Transformer Relay
3-110
Date: 2013-01-16
≥
1
EN
Flg_Pkp_UFPSBR
EN
Flg_Pkp_SFPSBR
SIG
I1>[x.21.I_OC_PSBR]
EN
FD_Z_x
10ms 0
&
≥
1
0 160ms
Flg_Pkp_PSBR_x
≥
1
SIG
Flg_Pkp_PSBR_x
SIG
[x.21.En_PSBR]
SET
[x.21.ZP1.En]
SIG
[x.21.En1]
SIG
[x.21.En2]
&
SIG
[x.21.Blk]
SIG
[x.Alm_VTS]
SIG
[x.In_VT]
≥
1
&
&
SIG
FD_Z_x
[x.21.ZP1.Op]
[x.21.ZP1.t_Op] 0s
SIG
Flg_Op_ZP1_x
[x.21.ZP1.St]
0 500ms
Figure 3.11-3 Logic diagram of stage 1 of phase-to-phase impedance protection of x side (x=HVS, MVS,
LVS)
Where:
Flg_Pkp_UFPSBR is the internal flag indicating that unsymmetrical fault PSBR element picks up.
Flg_Pkp_SFPSBR is the internal flag indicating that symmetrical fault PSBR element picks up.
Flg_Pkp_FDPSBR is the internal flag indicating that fault detector PSBR element picks up.
FD_Z_x is the operation flag of the fault detector of DPFC phase-to-phase current or that of
negative-sequence current of x side.
Flg_Pkp_PSB is the internal flag indicating that power swing blocking releasing element picks up.
[x.Alm_VTS] is the alarm message indicating voltage transformer circuit of x side is abnormal.
Flg_Op_ZP1_x is the internal flag indicating that stage 1 operation equation (i.e.
is met.
[x.In_VT] is the input signal of indicating VT in service, and please refer to
Section 3.24
For each stage impedance protection, if following three conditions are met, the stage protection
will be enabled.
(1) Logic setting [x.21.ZP1.En]
is set to “1”.
(2) Enabling inputs [x.21.En1], [x.21.
En2] are both set to “1”.
Summary of Contents for PCS-978
Page 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Page 2: ......
Page 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Page 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Page 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Page 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Page 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Page 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Page 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Page 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Page 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Page 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Page 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Page 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Page 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Page 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Page 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Page 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Page 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Page 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Page 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Page 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Page 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...