2 Technical Data
PCS-978 Transformer Relay
2-9
Date: 2013-01-16
[87T.K_Hm3_Inrush]
3
rd
or 5
th
harmonic setting for overexcitation
[87T.K_Hm3/Hm5_OvExc]
0.05~0.3, steps 0.001
Tolerance of 2
nd
and 3
rd
harmonic settings
0.01
Tolerance of 5
th
harmonic settings
0.02
Tolerance of operating current
≤5% of operating current or 0.02pu, whichever is
greater
Drop-off to pickup ratio
≥95%
Operating time (Without blocking criteria)
50Hz:
≤ 30ms( Id>2x[87T.I_Biased])
60Hz:
≤ 25ms( Id>2x[87T.I_Biased])
Drop-off time
≤30ms
2.7.1.2 Instantaneous Differential Protection
Current setting [87T.I_Instant]
0.05 ~ 20pu, 0.001pu steps
Tolerance of current setting
≤2.5% of setting or 0.02pu, whichever is greater
Drop-off to pickup ratio
≥95%
Operating time
50Hz:
≤ 20ms( Id>1.5x[87T.I_Instant])
60Hz:
≤ 20ms( Id>1.5x[87T.I_Instant])
Drop-off time
≤30ms
2.7.1.3 DPFC Current Differential Protection
Pickup current value
0.2pu
Tolerance of operating current
≤10%
Slope 1 value
0.6 (fixed)
Slope 2 value
0.75 (fixed)
Drop-off to pickup ratio
≥95%
Operating time
50Hz:
≤30ms (
d
I
>2x0.2pu)
60Hz:
≤25ms (
d
I
>2x0.2pu)
Drop-off time
≤30ms
2.7.2 Restricted Earth Fault Protection
Current setting of knee point [64REF.I_Knee]
0.1~4In, 0.001In steps
Pickup up setting [64REF.I_Biased]
0.05 ~ 5In, 0.001In steps
Time delay setting [64REF.Slope]
0~20s, 0.001s steps
Restraint slope setting [64REF.t_Op]
0.20~0.75. steps 0.001
Tolerance of operating current
≤5% of operating current or 0.02×In, whichever is
Summary of Contents for PCS-978
Page 1: ...PCS 978 Transformer Relay Instruction Manual NR Electric Co Ltd ...
Page 2: ......
Page 6: ...Preface PCS 978 Transformer Relay IV Date 2013 01 16 ...
Page 10: ...Preface PCS 978 Transformer Relay VIII Date 2013 01 16 ...
Page 62: ...3 Operation Theory PCS 978 Transformer Relay 3 p Date 2013 01 16 ...
Page 250: ...4 Supervision PCS 978 Transformer Relay 4 b Date 2013 01 16 ...
Page 264: ...4 Supervision PCS 978 Transformer Relay 4 14 Date 2013 01 16 ...
Page 266: ...5 Management PCS 978 Transformer Relay 5 b Date 2013 01 16 ...
Page 272: ...5 Management PCS 978 Transformer Relay 5 6 Date 2013 01 16 ...
Page 334: ...6 Hardware Description PCS 978 Transformer Relay 6 60 Date 2013 01 16 ...
Page 370: ...8 Human Machine Interface PCS 978 Transformer Relay 8 d Date 2013 01 16 ...
Page 404: ...8 Human Machine Interface PCS 978 Transformer Relay 8 34 Date 2013 01 16 ...
Page 406: ...9 Configurable Function PCS 978 Transformer Relay 9 b Date 2013 01 16 ...
Page 446: ...10 Communication PCS 978 Transformer Relay 10 26 Date 2013 01 16 ...
Page 448: ...11 Installation PCS 978 Transformer Relay 11 b Date 2012 10 09 ...
Page 456: ...11 Installation PCS 978 Transformer Relay 11 8 Date 2012 10 09 ...
Page 458: ...12 Commissioning PCS 978 Transformer Relay 12 b Date 2012 12 07 ...
Page 468: ...12 Commissioning PCS 978 Transformer Relay 12 10 Date 2012 12 07 ...
Page 470: ...13 Maintenance PCS 978 Transformer Relay 13 b Date 2012 10 09 ...
Page 474: ...13 Maintenance PCS 978 Transformer Relay 13 4 Date 2012 10 09 ...
Page 476: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 b Date 2012 10 09 ...
Page 478: ...14 Decommissioning and Disposal PCS 978 Transformer Relay 14 2 Date 2012 10 09 ...
Page 480: ...15 Manual Version History PCS 978 Transformer Relay 15 2 Date 2013 01 16 ...