This installation manual must be handed to the customer and must be kept in a safe place throughout the whole period of use!
4.D. Pre-assembly steps
4.D.1. Arrival at the work site
The safety helmet will be worn at all times on the work site to protect against possible falling objects. Boots
should also be worn with the sole protected against sharp elements and the upper area of the toes protected with
metal reinforcements to avoid damage caused by blows and crushing from falling heavy material.
When arriving at the work site, contact the client or representative, verify that the space where the door will be
placed is tidy and free of obstacles, and supervise the site indicated for the unloading of the material. The site
intended for the storage of material shall be as close to the opening as possible.
Ensure that a three-phase and/or single-phase power supply is available.
4.D.2. Unloading of materials
When unloading material, weight less than or equal to 50 kg will be unloaded manually by two operators, while a
boom or crane will be used for unloading weights over 50 kg.
ATTENTION:
Installers must strictly comply with the rules on safety in the workplace, on the work site and
the safety of the installations.
ATTENTION:
All terms set out here with regard to safety are general terms. Along with this manual, you
should always have available the manual for the prevention of occupational hazards, which provides more
detailed information on safety measures.