©Novinium, Inc. 2016, all rights reserved.
NRI 603 – Small Diameter Cables – SPR
Revised: February 19, 2016
Page
10
of
11
When the black BB reaches the
1cc/min mark on the black ball
scale, compare the fluid currently
supplied to the fluid floor and target
amounts.
If the supplied amount is above
the floor, the feed end may be
pinned.
1/0 and smaller cables may be
pinned even if the supplied fluid
is lower than the floor.
The limited space in these cables
might not allow enough fluid to
reach the floor. Pin the cable.
Figure 16:
Liquid flow meter BBs are at 1cc/min.
2.
Pin the inlet.
Close the ball valve to the injection tool to prevent fluid spray.
Insert the plug pin into the IA with the injection tool.
Remove the injection tool from the IA.
Check the plug pin hole for leaks and tap the pin in if it is not flush.
Figure 17:
Non-flush plug pin.
Wrap the saddle chain around a rag to protect and keep debris out of the injection tool.