Wiring
110
UDACT Instruction Manual PN 50050:H 09/16/2002
Below is a remote installation of a UDACT with an AM2020/AFP1010 using an MPS-24A main power
supply:
Figure 29 UDACT and AM2020/AFP1010 with MPS-24A
Below is an internal installation of a UDACT with an AM2020/AFP1010 using an MPS-24B main
power supply:
Figure 30 UDACT and AM2020/AFP1010 with MPS-24B
EARTH
Comm FAILURE
+24V
+24V
GND
RS+
RS–
SHIELD
RS+
Rs–
ACS/TERM
TERM
+24R COMMON +24
COMMON
POWER LIMITED
BAT + BAT -
To Phone Lines
(supervised)
Solid Earth
Ground
Connection
MPS-24A
SIB-2048
EIA-485
Interface
DO NOT USE
UDA
CT
-1
5.cdr
CAB-3/4 Series Cabinet
ABS-8R or UBS-1
Ferrite Cores
EARTH
Comm FAILURE
+24V
+24V
GND
RS+
RS–
SHIELD
RS+
Rs–
ACS/TERM
TERM
COMMON
COMMON
BATT -
+24V POWER
+24V RESET
BATT +
To Phone Lines
(supervised)
Connect to CHS-4
Chassis
MPS-24B
SIB-2048
EIA-485
Interface
DO NOT USE
UDA
CT
-1
6.cd
r
Technical Manuals Online! - http://www.tech-man.com