Installing a VCE
Video Codec Enclosure (VCE) 323-3221-291 Rel 1.0 Standard
Procedure 2-3
Cabinet installation (wall mount)
Use this procedure to install a VCE on a wall; see Figure 2-1 on page 2-1 for
clearance and location information.
Note 1:
Prior to shipping the cabinet to the site, determine the type of
electrical distribution panel and the availability of a suitable 120 Vac, 15 A
power supply with a double-pole breaker/isolator. Check where the power
cable and signal cables are to be run. Arrange for any outside contract work
to be completed prior to the installation of the cabinet.
Note 2:
If a VCE is bolted to a wall, it must be connected to the local power
through a conduit or armoured cable.
Note 3:
A VCE cabinet can only be mounted to a wood-stud or cement wall
using the Wall Mounting Kit (PEC NT2H57KB) option. Do not mount the
cabinet on a metal-stud wall. A minimum of 1 in. (25 mm) clearance is
required between the top of the cabinet and any overhead obstruction (for
example, the ceiling).
Tools
1 Wall Mounting Kit (PEC NT2H57KB)
1 Drill, electric (hammer-type if drilling concrete or masonry)
1 Drill bit suitable for drilling holes for wall anchors
1 Socket set, 1/2 in. drive
1 Wire strippers
1 Flat-bladed screwdriver
1 Electrician standard tools
1 5/32 in. Allen key
Action
Step
Action
1
Before positioning and securing the VCE, mark all references and layout lines
on the wall in accordance with the building plan drawing and the job
specifications.
2
Mark the 16 anchor points using the wall mounting bracket as a template, see
Figure 2-6.
—continued—