2-6
Installing a VCE
Video Codec Enclosure (VCE) 323-3221-291 Rel 1.0 Standard
Procedure 2-2 (continued)
Cabinet installation (Zone 4 earthquake)
Step
Action
2
Mark the VCE anchor points as shown in Figure 2-3.
Figure 2-3
VCE anchor points
3
Drill the floor anchor holes in accordance with one of the following:
•
Concrete floor
Use an electric drill with a masonry drill bit. Drill holes at
least 3.25 in. (83 mm) deep. Use a vacuum cleaner to remove cement
particles from the holes.
•
Wood/steel floor
Drill appropriate pilot holes for lag bolts in wood, or
clearance holes for machine bolts in steel.
Note:
If the VCE is not installed immediately after drilling the anchor holes,
cover the anchor holes with adhesive tape.
4
Remove the cardboard protection from the VCE. Using a 5/32 in. Allen key,
remove the four cover-retaining screws and slide the cover off the VCE; see
Figure 2-4.
Note:
If the cover does not come off freely, insert a flat-bladed screwdriver
into the slots located in the lower rear corners of the VCE cover and jog the
cover loose.
—continued—
Wall
Wall clearance
typically
0.75 in.(19 mm)
3.25 in. (85 mm)
17.5 in. (445 mm)
20.6 in. (525 mm)
1.7 in. (43 mm)
1.7 in. (43 mm)
Anchor points
Anchor points
Leveling feet
Leveling feet
Cabinet