Cabling specifications 4-3
Meridian SuperNode MSL-100 Intelligent Peripheral Equipment (IPE) Reference Manual MSL14
Figure 2 Terminal Block Harness (TB1) wiring diagram
The following table describes cable designations for the IPEC and the MPDC.
BAT RTN
0/1
BAT
0/1
BAT
2/3
BAT RTN
2/3
LRTN
Field-made connections to PDC with #6 AWG cable
BAT
0/1
BAT
2/3
BAT RTN
0/1
BAT RTN
2/3
LRTN
Table 1 Cabling for the IPEC and MPDC (Sheet 1 of 2)
Cable Designation
IPEC
Position
MPDC Connection
-48 V dc (A)
XX
Fuse 00 on A fuse panel
-48 V dc (B)
XX
Fuse 00 on B fuse panel
BR (A)
XX
Position 00 on row A of BRTN plate
BR (B)
XX
Position 00 on row B of BRTN plate
-48 V dc (A)
YY
Fuse (NEXT or LAST) on A fuse panel