
Page 1 of 136
Meridian 1 Option 11C Compact
Technical Reference Guide
10
Chapter 1 — Provisioning
Introduction
This chapter outlines the procedures required to determine equipment
requirements.
Provisioning a new system
Provisioning a new system consists of:
•
Defining and forecasting growth.
•
Calculating number of trunks required.
•
Calculating number of lines required.
•
Assigning equipment and preparing an equipment summary.
Summary of Contents for Meridian 1 Option 11C Compact
Page 3: ...553 3121 100 Standard 2 0 September 1998 ...
Page 11: ...viii About this guide 553 3121 100 Standard 2 0 September 1998 ...
Page 21: ...Page 10 of 136 Chapter 1 Provisioning 553 3121 100 Standard 2 0 September 1998 ...
Page 41: ...Page 30 of 136 Chapter 2 Transmission parameters 553 3121 100 Standard 2 0 September 1998 ...
Page 63: ...Page 52 of 136 Chapter 6 SDI ports 553 3121 100 Standard 2 0 September 1998 ...
Page 103: ...Page 92 of 136 Chapter 8 M2250 Attendant Console 553 3121 100 Standard 2 0 September 1998 ...
Page 107: ...Page 96 of 136 Chapter 9 NTMW05 Digital Line Card 553 3121 100 Standard 2 0 September 1998 ...