Install and configure ITG ISL Trunk node
Page 169 of 378
ITG Trunk 2.0 ISDN Signaling Link (ISL)
Description, Installation and Operation
Install filter and NTND26 cable (for MSDL and DCHIP
cards in same Large System equipment row)
1
Install the bracket for the 15-pin I/O panel filter connector in one of the
two smaller openings (J2, J3, J4, J5) of the I/O panel of the IPE Module
that contains the DCHIP card.
2
Install the 15-pin I/O panel filter connector on the inward side of the
bracket.
Figure 26
15-pin filter connector installation
System I/O Panel
Mounting
Screw
S y ste m
B a c k p la n e
S id e
(In sid e I/O
P a n e l)
E x te rio r sid e o f
S y s te m (to M D F
e tc .)
N T N D 2 6 A A
C a b le In s er tio n
N T M F 0 4 B A
in se rtio n
Summary of Contents for ISDN Signaling Link
Page 2: ......
Page 4: ...Page 4 of 378 553 3001 202 Standard 1 00 April 2000...
Page 16: ...Page 16 of 378 Contents 553 3001 202 Standard 1 00 April 2000...
Page 18: ...Page 18 of 378 About this guide 553 3001 202 Standard 1 00 April 2000...
Page 378: ...Page 378 of 378 Index 553 3001 202 Standard 1 00 April 2000...
Page 379: ......