Page 91 of 120
Installation and Configuration
98
Preparing the system
Contents
This section contains information on the following topics:
Verifying ISDN BRI operation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Setting up ISDN BRI test terminals and trunks . . . . . . . . . . . . . . . . . .
Introduction
This chapter describes how to prepare ISDN BRI equipment for acceptance
testing. It explains how to verify that ISDN BRI cards are enabled and
functioning correctly and how to correct any problems before starting the test.
Verifying ISDN BRI operation
After ISDN BRI equipment has been installed and configured, you can
visually inspect ISDN BRI cards to make sure that they are operating
correctly by observing their LEDs:
•
Check the red Dis LED located on the MISP faceplate. If the Dis LED on
an MISP is lit, check that the MISP is disabled or faulty. If it is
extinguished, check that the MISP is enabled and operating. To enable
the MISP or to correct a problem, refer to
ISDN Basic Rate Interface:
Maintenance
(553-3001-518).
Summary of Contents for Communication Server 1000M
Page 2: ......
Page 4: ...Page 4 of 120 Revision history 553 3001 218 Standard 2 00 September 2004...
Page 12: ...Page 12 of 120 About this document 553 3001 218 Standard 2 00 September 2004...
Page 16: ...Page 16 of 120 Preparing for installation 553 3001 218 Standard 2 00 September 2004...
Page 52: ...Page 52 of 120 Installing ISDN BRI hardware 553 3001 218 Standard 2 00 September 2004...
Page 90: ...Page 90 of 120 Configuring ISDN BRI hardware 553 3001 218 Standard 2 00 September 2004...
Page 98: ...Page 98 of 120 Preparing the system 553 3001 218 Standard 2 00 September 2004...
Page 120: ...Page 120 of 120 Generating traffic reports 553 3001 218 Standard 2 00 September 2004...
Page 121: ......