Installing ISDN BRI hardware
Page 33 of 120
Installation and Configuration
Cross-connecting the MDF
The MDF cross-connects NE-A25B cables connected to SILC and UILC
ports with building wiring connected to ISDN BRI terminals.
Each SILC provides eight four-wire full-duplex ports. These ports are
connected to building wiring to form DSLs. These ports are
polarity-sensitive. Signal polarity must be maintained along each loop.
Each UILC provides eight two-wire full-duplex ports. These ports are
connected to twisted pair building wiring to form DSLs. These DSLs are not
polarity-sensitive and, although recommended, it is not necessary to maintain
signal polarity along each loop.
K
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
K
L
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
L
M
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
M
N
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
N
R
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
R
S
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
S
T
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
T
U
TR
0
TR
1
TR
2
TR
3
TR
4
TR
5
TR
6
TR
7
U
Note:
The cable pair designated TR is a 2B1Q full-duplex U interface.
Table 4
UILC port designation labels at the MDF: NT8D37 IPE module (16-cable configuration)
(Part 2 of 2)
8
9
10
11
12
13
14
15
Summary of Contents for Communication Server 1000M
Page 2: ......
Page 4: ...Page 4 of 120 Revision history 553 3001 218 Standard 2 00 September 2004...
Page 12: ...Page 12 of 120 About this document 553 3001 218 Standard 2 00 September 2004...
Page 16: ...Page 16 of 120 Preparing for installation 553 3001 218 Standard 2 00 September 2004...
Page 52: ...Page 52 of 120 Installing ISDN BRI hardware 553 3001 218 Standard 2 00 September 2004...
Page 90: ...Page 90 of 120 Configuring ISDN BRI hardware 553 3001 218 Standard 2 00 September 2004...
Page 98: ...Page 98 of 120 Preparing the system 553 3001 218 Standard 2 00 September 2004...
Page 120: ...Page 120 of 120 Generating traffic reports 553 3001 218 Standard 2 00 September 2004...
Page 121: ......