10-40
Page 33
2008-10-01
(e)
Blower speed rotation must to be monitored to ensure proper control of input
modulation. System will lock out gas valve operation if proper blower speed
is not detected.
(f)
A secondary combustion air safety, in addition to blower speed monitoring,
utilizing a mechanical pressure differential switch, must be used with each
blower to ensure combustion air is entering the pre-mix blower properly.
(g)
Modular heat exchanger shall be easily removable through unit sidewall.
(h)
Removable cover at front of unit facilitates easy cleaning (when applicable)
with complete access to tank and heat exchanger surfaces.
(6)
Automatic water level control within a separate float chamber, isolated from the
boiling action, to prevent false water level indication.
(a)
Fill rate must modulate to match capacity demand to ensure consistent
output. Fill cycles based on low water only is not acceptable.
(b)
System shall fill through the bottom of the tank to reduce steam-quenching
effect and noise level. Filling at top of the tank is not acceptable.
(c)
Unit water level is to be continuously monitored with a dual magnetic
electronic float system, located outside of the boiling water to ensure
accurate water level control and reduced maintenance. Cool fill water is to be
supplied into the sensing chamber to keep the device cool. Systems using
conductivity probes or floats located within hot reservoir water are not
acceptable.
(d)
Tank and float chamber to be separated with a minimum of 1" (25 mm) rigid
insulation, minimizing potential scale build up on float mechanisms, due to
heating of the contained water.
(e)
Humidifier shall have a dual fill valve to feed water to the tank and float
chamber, to reduce scaling and mineral build up on the magnetic floats.
(f)
Float chamber to include LED indication of five possible water level
indications.
(g)
Ongoing self-diagnostics including periodic float operation and fill/drain rate
verification.
(h)
Positive drainage/blow-down using a drain pump, drawing water from the
bottom of the tank, maximizing mineral evacuation (when applicable).
Skimmer not acceptable.
(i)
Blow down interval shall be based on actual steam production, and must be
adjustable to compensate for all water conditions, to ensure maximum energy
and maintenance efficiency.
(j)
Pre-cleaning flushing feature shall be provided to reduce maintenance time.
(k)
Must include end of season blow-down feature to evacuate contained water
and minerals after 72 hours with no demand for humidification.
Summary of Contents for GS Series GSP Indoor
Page 1: ...1503540 C GS Series GSTC GSP Indoor GSTC Outdoor Engineering Manual ...
Page 7: ...2008 10 01 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 8: ...10 00 Page 1 2008 10 01 10 00 PRINCIPLE OF OPERATION ...
Page 10: ...10 00 Page 3 2008 10 01 Figure 1 GS Indoor Series Figure 2 GS Outdoor Series ...
Page 11: ...10 00 Page 4 2008 10 01 Figure 3 GSTC Key Pad Figure 4 GSP Key Pad ...
Page 13: ...10 00 Page 6 2008 10 01 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 14: ...10 10 Page 7 2008 10 01 10 10 OPERATION ...
Page 17: ...10 10 Page 10 2008 10 01 Figure 3 Physical Dimensions GS Outdoor Humidifier ...
Page 21: ...10 10 Page 14 2008 10 01 Figure 4 GSTC GSP Indoor Clearance Figure 5 GSTC Outdoor Clearance ...
Page 23: ...10 10 Page 16 2008 10 01 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 24: ...10 20 Page 17 2008 10 01 10 20 MAINTENANCE ...
Page 27: ...10 20 Page 20 2008 10 01 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 28: ...10 30 Page 21 2008 10 01 10 30 OPTIONS ACCESSORIES ...
Page 35: ...10 30 Page 28 2008 10 01 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 36: ...10 40 Page 29 2008 10 01 10 40 SPECIFICATION ...
Page 44: ...10 40 Page 37 2008 10 01 THIS PAGE INTENTIONALLY LEFT BLANK ...