© Norsat International Inc.
(“Norsat”) All Rights Reserved
2021-12-20 DOC-001527 Rev A
49
System Maintenance
NO.
DESCRIPTION
FREQUENCY
1
Inspect all cables for damage
Once per month
2
Toggle the active LNB to standby to test that
the system is working as expected
Once per month