Rhino
R
VE Bulk Unloaders, 125-mm Frame
25
Part 1608271-04
E
2019 Nordson Corporation
CE Unloader Operation
NOTE:
The following procedures only apply to CE unloaders. Refer to the
Standard Unloader Operation
section for standard unloaders.
Read and understand this section before performing any operation
procedures. Contact a local Nordson representative with questions
regarding the operation of this equipment.
WARNING:
Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
CAUTION:
To prevent damage to the follower plate and seals, never use a
damaged material container.
WARNING:
When operating the elevator controls, it is important to
remember that
Neutral
is not a locked and secured position. The follower
plate may drift downward over time.
First-Time Startup
NOTE:
This procedure applies only to starting up a new system for the
first time.
1. Close the air motor ball valve (1).
2. Make sure that the solvent chamber (10) is properly filled with the
solvent chamber fluid.
3. Set the air motor regulator (2) to 0 psi/bar.
4. Set the ram regulator (3) to 30 psi (2 bar).
NOTE:
It may be necessary to increase the cylinder pressure when
using high-viscosity material to ensure proper operation of the cylinder
assembly and to prevent the pump from losing contact with the material.
Use the minimum air pressure necessary to operate the elevator.
5. Make sure that the air hoses and material delivery hose are not kinked
or pinched.
6. Press and hold in the
Ram Up
push button to raise the follower plate.
7. Inspect the material container for dents or other damage. Do not use a
damaged container.