Rhino
R
VE Bulk Unloaders, 125-mm Frame
20
Part 1608271-04
E
2019 Nordson Corporation
Install a Pail Follower Module
1. Perform one of the following:
S
5.8 Cubic Inch Hydraulic Sections: Lubricate the O-ring (3) with
O-ring grease and install it onto the follower plate (7).
S
8.1 Cubic Inch Hydraulic Sections: Install the gasket (2) onto the
follower plate (7).
2. Install the follower plate (7) onto the hydraulic section (8) using the
screws (1), washers (6), lock washers (5), and nuts (4). Tighten the
nuts to 25
−
30 ft-lb. (34
−
40.5
Nwm
) in the sequence shown.
Install a 30/55-Gallon Follower Module
1. Lubricate the the O-ring (3) with O-ring grease.
2. Install the follower plate (7) onto the hydraulic section (8) using the
screws (1) and lock washers (5). Tighten the screws to 25
−
30 ft-lb.
(34
−
40.5
Nwm
) in the sequence shown.
4
5
6
3
1
GASKET USED ON
8.1 CUBIC INCH
HYDRAULIC SECTIONS.
O-RING USED ON
5.8 CUBIC INCH
HYDRAULIC SECTIONS.
DO NOT LUBRICATE.
2
5
3
1
8
8
7
7
30/55-GALLON FOLLOWER MODULE
PAIL FOLLOWER MODULE
TORQUE SEQUENCE
1
2
3
4
Figure 7
Installing the Follower Module