Rhino
R
VE Bulk Unloaders, 125-mm Frame
16
Part 1608271-04
E
2019 Nordson Corporation
Unpack the Bulk Unloader
1. Remove the unloader from the packing crate and pallet. Perform the
following:
S
Examine all surfaces for evidence of dents, scratches, corrosion,
and other physical damage.
S
Report any damage to a Nordson representative.
2. Position the unloader at a location that allows access to the controls and
follower plate area.
3. Set the elevator regulator (2) and air motor regulator (4) to 0 psi/bar.
Make sure that the elevator control valve (3) is in the
Neutral
position
and that the air motor ball valve (5) is closed.
4. Connect the main air supply line to the pneumatic supply port (1).
5. Connect the material hose to either the material outlet port (8) or the
optional ball check valve port (7).
6. Pour solvent chamber fluid into the solvent chamber (6) until it is within
1.5 in. (38 mm) from the top of the solvent chamber. Refer to the pump
manual for the solvent chamber fluid type and part number.
7. Install the follower module. Refer to the
Install the Follower Module
section for the procedures.