Rhino
R
VE Bulk Unloaders, 125-mm Frame
15
Part 1608271-04
E
2019 Nordson Corporation
Installation
Read and understand this entire section before performing any installation
procedures. Contact a local Nordson representative with questions
regarding the installation of this equipment.
WARNING:
Allow only qualified personnel to perform the following tasks.
Follow the safety instructions in this document and all other related
documentation.
Personnel performing these procedures must know how to safely operate
the unloader elevator controls.
Review the following before installing the unloader into a system:
S
Installation procedures are the same for the standard and CE unloaders.
S
Install a customer-supplied shutoff valve in the air supply line to isolate
the unloader for maintenance or other procedures.
S
The maximum main air supply pressure is 100 psi (7 bar).
S
The main air supply to the unloader must be at least 60 psi (4.83 bar)
and filtered to 5 microns. Use a
3
/
4
-in. air line with an instantaneous
flow rate of at least 175 scfm. Refer to the
Rhino SD2/XD2 Pumps
manual for more data.
S
The material outlet port on the pump is 1
1
/
4
in. SAE O-ring boss.
S
Use hose supports in applications where the material hose is suspended
by an overhead tool balancer or similar device to prevent hose damage.
Route the hose in a manner that prevents kinking and abrasion.
WARNING:
When operating the elevator control valve, it is important to
remember that
Neutral
is not a locked and secured position. The follower
module may drift downward over time.