NOTE:
Refer to
Appendix A, Retrofit Refill System With Nordson Level Sensor,
for updated
information.
See Figure 5. The PCA is inside the control box:
Figure
5
PCA board (located inside the control box)
Connect line voltage to the control box at the supplied terminal block
and ground. Power can be supplied from the plant service to the
control box or directly from the Mesa melter using the optional power
harness kit.
A potentiometer labeled ”Delay” is for a fill time delay. This delay is
the time duration between the level sensor calling for more adhesive
and when the fill system activates. The delay time prevents the
system from frequently turning on and off. The delay time is preset
from the factory at 60 seconds, but can be adjusted from 0 to 119
seconds. The factory sets the potentiometer at the 12 o'clock
position, sufficient for the majority of applications. For reference, 9
o'clock is 20 seconds and 3 o'clock is 100 seconds.
Summary of Contents for Mesa Fulfill
Page 46: ...Fulfill Retrofit for Mesa Melters 42 Part 1121938_02 2013 Nordson Corporation Wiring Diagram...
Page 47: ...Fulfill Retrofit for Mesa Melters 43 Part 1121938_02 2013 Nordson Corporation Dimensions...
Page 48: ...Fulfill Retrofit for Mesa Melters 44 Part 1121938_02 2013 Nordson Corporation...
Page 64: ......
Page 65: ......
Page 66: ......