Fulfill
Retrofit for Mesa
Melters
14
Part 1121938_02
2013
Nordson Corporation
Pneumatic & Mechanical Components
Refer to Figure 3 as you learn about the components of the Mesa Fulfill
retrofit assembly.
1
2
3
4
5
6
Figure
3
Assembled Mesa Fulfill retrofit assembly.
(1). Adhesive Storage Bin
Place adhesive in the adhesive storage bin. The bin contains a gasket that
prevents debris from entering the bin. For best results, break up the
adhesive as much as possible when emptying into the bin. Do not get the
adhesive wet.
(2). Air Pressure Regulator/Solenoid Assembly
The supplied air pressure regulator is permanently set at 65 psig, the optimal
setting for most adhesives.
The solenoid valve turns on after the sensor indicates level state and the time
delay has been reached. The solenoid directs compressed air to flow to the
suction lance.
Summary of Contents for Mesa Fulfill
Page 46: ...Fulfill Retrofit for Mesa Melters 42 Part 1121938_02 2013 Nordson Corporation Wiring Diagram...
Page 47: ...Fulfill Retrofit for Mesa Melters 43 Part 1121938_02 2013 Nordson Corporation Dimensions...
Page 48: ...Fulfill Retrofit for Mesa Melters 44 Part 1121938_02 2013 Nordson Corporation...
Page 64: ......
Page 65: ......
Page 66: ......