boiler operation
installation
before starting the boiler, it is necessary to follow this check list:
•
installed accessories;
•
flue gas connection installed in accordance with current regulations;
•
boiler aligned by means of the adjustable feet;
•
system filled and bled in accordance with current regulations;
•
connections checked for leaks;
•
foreign bodies (e.g. packaging residues) removed from inside the boiler;
•
check that the fire clay panels fit properly (upper and lower combustion chamber);
•
electrical connections installed;
•
Test all electrical components / manual operation;
•
first IgnITIon (see fIrsT sTarT-uP section);
•
check that the boiler is working and check the smoke values;
•
operator instructions on operation and cleaning.
manual operation/smoKe fan anD pump test
before starting the boiler for the first time, it is necessary to check the operation of the boiler circuit pump and the fan in manual mode.
Temp.
WaTer
Temp.
smoke
aIr
Press the
menu
key
IgnITIon
manual
Down arrow
key
on
manual
confirm by pressing
menu
1) smoke rPm (0-100%)
2) smoke extraction motor (on/off) *1st led on
3) boiler pump (on/off) *2nd led on
4) clean contact Ta (on/off)
5) alarm (on/off)
check that the fan and pump
of the boiler circuit are running
after checking the operation of the boiler circuit pump and fan, it is possible to start the first IgnITIon process.
*In manual mode, the 3rd led is always on