ENGLISH
chimney sweep button anD measurinG emissions
boiler measurement (if applicable by current reGulations)
While the designated auditor is performing the measurements, it is convenient for the system installer to be present. If system problems are
encountered, the installer can intervene immediately in total safety. The measuring sequence must be strictly complied with!
PreParaTIon:
- completely clean boiler (important: heat exchanger pipes)
- Perfectly clean smoke duct and chimney flue
- draught regulator in perfect working order and correctly set (15 Pa)
- fuel wood in logs (50 cm length, Ø about 8-10 cm)
- log residual moisture 12 % –20 % (measured in the middle)
- The technical storage tank must be warm, but not at the maximum temperature to prevent the product from modulating
- check the tightness of the door gaskets (they must be airtight)
boIler measuremenT:
- before measuring, the boiler must have been operating continuously for approximately 1 hour so that the internal parts reach the
operating temperature
- When starting to measure, the water temperature in the boiler must be at least 60°c
- The technical storage tank must have sufficient capacity to ensure constant heat absorption (the smoke extraction motor must work
with 100 % without modulating)
- If there are large fluctuations in the smoke extraction motor power, it is necessary to stop the measuring operations and find the
cause of irregular fan operation
leave the residual embers from the previous combustion and distribute them evenly. a 4-5 cm bed of embers would be ideal.
fill the loading chamber by creating a pile of wood from the smallest pieces to the largest ones. In order to prevent the flames from spreading
too quickly in the gaps between the logs, it is advisable to choose the width in such a way that the logs fit tidily next to one another.
The upper loading door is then closed.
leave the ignition door ajar with a gap of about 1 cm to help light the new load of fuel, so that the exhaust gas temperature reaches
approximately 220°c.
measurement of the chimney sweep can be started 5 minutes after the ignition door is closed.
39
39
Summary of Contents for LNK15 EVO
Page 2: ...ENGLISH 2 2 ...