19
8.2
Valve Module
1.
Install the valve module (E02) to the top of the NORAC valve block. Orient the 6-pin
Deutsch (CANbus) connectors towards the “P” and “T” ports with the label facing up.
Figure 15: Valve Module
2.
Verify the valve coil connectors are oriented vertically (
Figure 16
).
Figure 16: Align Coils
3.
Place the valve module between the valve coils. Slide a valve mounting bracket over the
connectors of the valve module and the valve coil connectors. This may require flexing the
plastic bracket slightly (
Figure 17
).
4.
Ensure the bracket is pushed over the connectors far enough to allow the clips to engage
behind the valve connectors.
Output Number Normal Function
1
Left Up
2
Left Down
3
Right Up
4
Right Down
5
Main Up
6
Main Down
7
Roll CW
8
Roll CCW
Summary of Contents for UC5 Topcon X30
Page 1: ...John Deere R Series Active Wing Roll Control Installation Manual JD12A ...
Page 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 JD12A System Parts ...
Page 8: ...5 4 2 Hydraulic Plumbing Figure 3 JD12A Hydraulic Plumbing ...
Page 25: ...22 Figure 20 Valve Block Solenoid Locations ...
Page 29: ...26 Figure 23 Load Sense Bleed Orifice Location on Top of Block Remove this coil ...
Page 45: ...42 12 5 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Page 46: ...43 12 6 ITEM C20 43240 41 CABLE UC5 INTERFACE TILT DT R4038 ...
Page 47: ...44 12 7 ITEM C21 43240 38 CABLE UC5 INTERFACE JOHN DEERE R4030 4038 ML ...
Page 48: ...45 12 8 ITEM C30 43250 07 CABLE UC5 BATTERY JD FUSED ...