15
6.5
Ultrasonic Main Lift Sensor Mounting Guidelines
The following guidelines will ensure optimal sensor performance and prevent sensor
measurement error.
1.
In its lowest position, the sensor must be 9 inches (23 cm) or more from the ground.
2.
The centerline of the acoustic cone should be approximately vertical at normal operating
heights.
3.
The bottom of the sensor must be at least 9 inches in front of the spray nozzles and boom
structure. (This does not apply for the main lift sensor)
4.
The bottom of the sensor must be at least 9 inches above the spray nozzles.
5.
Ensure there are no other obstructions with a 12 inch (23 cm) diameter circle projected
directly below the sensor.
Summary of Contents for UC5 Topcon X30
Page 1: ...John Deere R Series Active Wing Roll Control Installation Manual JD12A ...
Page 7: ...4 4 Kit Parts 4 1 Kit Overview Figure 2 JD12A System Parts ...
Page 8: ...5 4 2 Hydraulic Plumbing Figure 3 JD12A Hydraulic Plumbing ...
Page 25: ...22 Figure 20 Valve Block Solenoid Locations ...
Page 29: ...26 Figure 23 Load Sense Bleed Orifice Location on Top of Block Remove this coil ...
Page 45: ...42 12 5 ITEM C10 43230 04 CABLE UC5 VALVE DT TO DT ...
Page 46: ...43 12 6 ITEM C20 43240 41 CABLE UC5 INTERFACE TILT DT R4038 ...
Page 47: ...44 12 7 ITEM C21 43240 38 CABLE UC5 INTERFACE JOHN DEERE R4030 4038 ML ...
Page 48: ...45 12 8 ITEM C30 43250 07 CABLE UC5 BATTERY JD FUSED ...