27
4.
Connect the free hanging black wire on
C10
to a good electrical ground on the
sprayer.
5.
Connect the 16-pin AMP plug on
C10
to
the UC4+ Control Panel (
E01
) in the
sprayer cab.
6.
Connect the valve extension cable (
C04
)
to the 6-pin Tower connector on
C10
.
The valve extension cable (C04)
may be packaged with one GP end
not installed. This is normal; it
helps installations for other
sprayer types. Pin this connector
on (connector included) as per
drawing in Section 5.5. TAKE
EXTRA CARE! These pins
require a special tool to remove
them if you make an error!
7.
Connect one end of the UC4 trunk cable
(
C01
) to the UC4+ Control Panel (
E01
).
8.
Route
C04
and
C01
to the rear of the
sprayer where the NORAC hydraulic
valves are located.
9.
Connect the 6-pin Tower on the UC4
Valve Cable (
C03
) to the 6-pin Shroud
on
C04
at the rear of the sprayer (
Figure
34
).
Figure 34 – Cable Configurations: C01,
C02, C02B, C03 and C04
10.
In
Figure 35
, the connectors are marked
RIGHT UP
,
LEFT UP
,
RIGHT PORT
and
LEFT PORT
. Cables labeled with
PORT
go on the side as the hydraulic
hoses.
Fasten
with the included rubber
seals and screws.
Figure 35 – Valve Cable Connections
Summary of Contents for Gregson Maverick 120 Series
Page 9: ...7 Figure 3 Hydraulic Components ...
Page 14: ...12 Figure 9 Sensor Serial Number Installation Location 3 SENSOR SYSTEM 5 SENSOR SYSTEM ...
Page 32: ...30 5 3 ITEM C02B 44664 CABLE UC4 CAN NODE DUAL 5 4 ITEM C03 44656 VALVE CABLE VARIABLE RATE ...
Page 33: ...31 5 5 ITEM C04 44651 VALVE EXTENSION CABLE ...
Page 34: ...32 5 6 ITEM C10 44650 11 POWER CABLE GREGSON MAVERICK ...