NSW-5
Disassembly and Troubleshooting Instructions
PAMS Technical Documentation
Page 13
Issue 1 10/00
Nokia Mobile Phones Ltd.
Reassembly
17. Position the right hand Plunger onto
the start of the track and on the
Microphone Connector, as shown
18. Position the left hand Plungers onto the start of the track
and push the Slide Assembly into the phone.
! Push the Slide Assembly straight into the phone to
avoid bending the Plungers !
Note Torque for screws 0.23Nm
16. ! Assemble the phone completely before fit-
ting the Slide Assembly !
The remaining assembly is done in the reversed
order of the disassembly.