RACK installation
Desktop installation
Use
B1/B2/S1/S2
Use
A1/S3
Front/Back panel
Remove the fastening screws (ID 1) in the front panel and install the batteries (12V@7Ah).
Input connector (ID 2). This connector should be used when a second battery bank is installed or when
there is an external charger.
Output connector (ID 3) to be connected to the UPS (17NXGCON12001 or 17NXGCON11001).
Breaker (ID 4). Turn OFF in the event of maintenance. This cuts the battery bank stripes off from the
chain.
Summary of Contents for 17NXGCON38001
Page 1: ...UPS MANUALE UTENTE...
Page 19: ...UPS USER MANUAL...
Page 37: ......
Page 38: ...SAI MANUAL PARA EL USUARIO...